270 × 2 BHK TYPE LIG · 135 × 3 BHK TYPE-2 LIG · 117 × 1 BHK TYPE EWS · 36 × 3 BHK TYPE-1 LIG · 1 × Shop-2 · 1 × Shop-5
Carpet area
12–102 sq mper-type range, as filed
Land area
10,652 sq m
Description
1. Encumbrance details of Loan of Rs. 15,00,00,000.00 from State Bank of India on the project have been updated on 02.09.2020. This bears the approval of Honorable Chairman Sir.
Timeline
Construction startSep 2019
RERA registeredSep 2019
Proposed completionFeb 2023
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
564 units across 13 batches
BuildingTypeArea sq mCount
UNNATI NILAY1 BHK TYPE EWS30117
UNNATI NILAY2 BHK TYPE LIG5063
UNNATI NILAY3 BHK TYPE-1 LIG6018
UNNATI NILAY3 BHK TYPE-2 LIG6054
UNNATI NILAY2 BHK TYPE LIG50207
UNNATI NILAY3 BHK TYPE-1 LIG6018
UNNATI NILAY3 BHK TYPE-2 LIG6081
UNNATI NILAYShop-2701
UNNATI NILAYShop-5131
UNNATI NILAYShop-11021
UNNATI NILAYShop-4121
UNNATI NILAYShop-6151
UNNATI NILAYShop-3571
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 1.6km away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.7km away
ShoppingNo supermarket within 2km
Getting around
Expressway 3.3 kmPrimary road 3.0 kmRailway line 444 mRailway station 821m away (Kanakpura)Limited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹88.00 Cr declared to build 564 flats. What that works out to:
₹15.60 Lakhdeclared cost per flatall-in — land + construction
₹1,637/sq ftof built-up area₹17,622/sq m
26%of the cost is land₹2,006/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Ajmer Development Authority
Development Authority
Building Permitapproved 20 Sep 2019 · 7 yrs ago
The promised possession date (28 Feb 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ajmer Development Authority
Development authority
Has approved 51 RERA projects — 2.3% of Rajasthan.
a plotted-layout market — 16% apartments · 84% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.
Builders
40
On record
990 flats · 3,829 plots
Reach
4 districts
Since
2017
More layout-heavy than Rajasthan overall — 84% plots here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
406 residential projects still under way within 25 km. Step out ring by ring:
Of the 329 projects the radar draws within 6 km — every kind, every stage — 94 are residential projects still under way. This list keeps only those, and looks further out.