HORIZON
Share

MSG RESIDENCY

RAJ/P/2024/3414 · RAJ-RERA · https://gethorizon.in/projects/msg-residency-jaipur-7otb9n3g

01

Complete project overview

RAJ-RERA · Registration filing
Units
48 units
Mix
6 × 3 BHK TYPE 3 (103,203,303,403,503,603) · 6 × 3 BHK TYPE 4 (104,204,304,404,504,604) · 6 × 2 BHK TYPE 1 (107,207,307,407,507,607) · 6 × 2 BHK TYPE 2 (108,208,308,408,508,608) · 5 × 3 BHK TYPE 1 (101,201,301,401,501) · 5 × 3 BHK TYPE 2 (102,202,302,402,502)
Carpet area
66–92 sq mper-type range, as filed
Land area
1,287 sq m

Timeline

Construction startOct 2024
RERA registeredDec 2024
Proposed completionAug 2026
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

48 units across 12 batches
BuildingTypeArea sq mCount
MSG RESIDENCY3 BHK TYPE 1 (101,201,301,401,501)925
MSG RESIDENCY3 BHK TYPE 2 (102,202,302,402,502)925
MSG RESIDENCY3 BHK TYPE 3 (103,203,303,403,503,603)836
MSG RESIDENCY3 BHK TYPE 4 (104,204,304,404,504,604)836
MSG RESIDENCY3 BHK TYPE 5 (105,205,305,405,505)925
MSG RESIDENCY3 BHK TYPE 6 (106,206,306,406,506)925
MSG RESIDENCY2 BHK TYPE 1 (107,207,307,407,507,607)666
MSG RESIDENCY2 BHK TYPE 2 (108,208,308,408,508,608)666
MSG RESIDENCY3 BHK 601 with private terrace921
MSG RESIDENCY3 BHK 602 with private terrace921
MSG RESIDENCY3 BHK 605 with private terrace921
MSG RESIDENCY3 BHK 606 with private terrace921

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RAJ-RERA · Builder registration

MSG DEVELOPERS

OrganisationPromoter type
Jaipur, RajasthanBased in
1Projects
1City
2024–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
Plot No. 14, 15, 20 & 21, Kirti Sagar-P, Mangayawas, Jaipur, Jaipur, 302012
Village
Mangayawas
Taluka
Jaipur
District
Jaipur
Pincode
302012
What’s nearby
Schools1 school within 1km
HealthcareHospital 882m away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.7km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 896m away
Getting around
Expressway 1.1 kmPrimary road 823 mRailway line 1.1 kmRailway station 2.3km away (Kanakpura)Bus stop within 1km
Price analysisdeclared build cost — not a sale price

₹12.23 Cr declared to build 48 flats. What that works out to:

₹25.47 Lakhdeclared cost per flatall-in — land + construction
₹1,676/sq ftof built-up area₹18,041/sq m
2%of the cost is land₹163/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Rajasthan IGRS — DLC rates

In Rajasthan it’s called the DLC rate.

₹13,545per sq yd
₹16,200per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “MANGYAWAS”.
Highest rate
₹22,776 per sq yd — the top road-facing rate among the 5 residential rates published for this village

By the road it faces

interior plot₹16,200 / sq m₹13,545 / sq yd
road-facing₹22,700 / sq m₹18,980 / sq yd
41–60 ft road₹24,970 / sq m₹20,878 / sq yd
61–99 ft road₹26,110 / sq m₹21,831 / sq yd
100 ft+ road₹27,240 / sq m₹22,776 / sq yd

The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.

What this number is — and isn’t

  • The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 4 Dec 2024 · 1 yr ago

The promised possession date (30 Aug 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

410 residential projects still under way within 25 km. Step out ring by ring:

Of the 272 projects the radar draws within 6 km — every kind, every stage — 96 are residential projects still under way. This list keeps only those, and looks further out.

3 projects within 1 km — showing the nearest 3.

350 m awayGroup Housing

RIYASAT HEIGHT

SHREE GANESH CONSTRUCTION · Jaipur

Dec 2023registered
Aug 2026target completion
Declared cost₹5.50 CrScale30 flatsAuthorityRAJ-RERA
430 m awayGroup Housing

VIKAS HEIGHTS 3RD

VIKAS HEIGHTS 3RD · Jaipur

Dec 2024registered
Jan 2027target completion
Declared cost₹11.50 CrScale30 flatsAuthorityRAJ-RERA
500 m awayGroup Housing

VIKAS HEIGHTS 2ND

VIKAS HEIGHTS 2ND · Jaipur

Feb 2024registered
Nov 2026target completion
Declared cost₹14.00 CrScale36 flatsAuthorityRAJ-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.