Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
48 units across 12 batches
BuildingTypeArea sq mCount
ALTURA VII3BHK FLAT NO. 101 - 501905
ALTURA VII3BHK FLAT NO. 601 WITH PRIVATE TERRACE901
ALTURA VII3BHK FLAT No. 102 - 502935
ALTURA VII3BHK FLAT NO. 602 WITH PRIVATE TERRACE931
ALTURA VII3BHK FLAT NO. 103-603 AND 104-6048812
ALTURA VII3BHK FLAT NO. 105-505925
ALTURA VII3BHK FLAT NO. 605 WITH PRIVATE TERRACE921
ALTURA VII3BHK FLAT NO. 106 - 506855
ALTURA VII3BHK FLAT NO. 606 WITH PRIVATE TERRACE851
ALTURA VII3BHK FLAT NO. 107 - 607896
ALTURA VII3BHK FLAT NO. 108 - 508895
ALTURA VII3BHK FLAT NO. 608 WITH PRIVCATE TERRACE891
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 4.6 kmRailway line 1.3 kmRailway station 2.9km away (Bindayaka)Limited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹19.72 Cr declared to build 48 flats. What that works out to:
₹41.08 Lakhdeclared cost per flatall-in — land + construction
₹2,540/sq ftof built-up area₹27,336/sq m
14%of the cost is land₹1,864/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Building Permitapproved 18 Jan 2026 · 8 mo ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
403 residential projects still under way within 25 km. Step out ring by ring:
Of the 310 projects the radar draws within 6 km — every kind, every stage — 82 are residential projects still under way. This list keeps only those, and looks further out.