10 × L-13 TO L-22 · 10 × L-03 TO L-12 · 8 × Shop no 1 to 8 (Total Area 248.41 Sq Meter) · 2 × L-02 & L-23 · 1 × L-30 · 1 × L-29
Carpet area
9–120 sq mper-type range, as filed
Land area
6,608 sq m
Timeline
Construction startJan 2020
RERA registeredFeb 2020
Proposed completionDec 2023
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
41 units across 15 batches
BuildingTypeArea sq mCount
VEDIC VILLAS PHASE-IShop no 1 to 8 (Total Area 248.41 Sq Meter)98
VEDIC VILLAS PHASE-IL-30981
VEDIC VILLAS PHASE-IL-13 TO L-2210410
VEDIC VILLAS PHASE-IL-03 TO L-1210410
VEDIC VILLAS PHASE-IL-29971
VEDIC VILLAS PHASE-IL-27881
VEDIC VILLAS PHASE-IL-02 & L-23842
VEDIC VILLAS PHASE-IL-26831
VEDIC VILLAS PHASE-IP.NO. 031201
VEDIC VILLAS PHASE-IL-25811
VEDIC VILLAS PHASE-IL-01611
VEDIC VILLAS PHASE-IP.NO.011201
VEDIC VILLAS PHASE-IL-28961
VEDIC VILLAS PHASE-IP.NO.02921
VEDIC VILLAS PHASE-IL-24731
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
54 homes · 45 plotson the public record across 3 projects
3,692 sq mbuilt-up filed
9,700 sq mplotted area
22,916 sq mland declared
₹23.69 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 1.8km away
HealthcareHospital 826m away · 1 clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 498m away
ShoppingNo supermarket within 2km · Mall 1.0km away · Bank 700m away
Getting around
Expressway 2.1 kmPrimary road 5.0 kmRailway line 2.8 kmRailway station 2.8km away (Kanakpura)Limited bus connectivity nearby
Water & environment
Water body 3.0 km · Fountain RD
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹15.21 Cr declared to build 41 flats. What that works out to:
₹37.10 Lakhdeclared cost per flatall-in — land + construction
₹5,244/sq ftof built-up area₹56,445/sq m
61%of the cost is land₹1,295/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹10,034per sq yd
₹12,000per sq m
Which rate
residential, interior plot
Matched to
The rate published for “Lalarpura”.
Highest rate
₹14,047 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹12,000 / sq m
₹10,034 / sq yd
road-facing
₹14,000 / sq m
₹11,706 / sq yd
41–60 ft road
₹15,400 / sq m
₹12,876 / sq yd
61–99 ft road
₹16,100 / sq m
₹13,462 / sq yd
100 ft+ road
₹16,800 / sq m
₹14,047 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 12 Feb 2020 · 6 yrs ago
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
418 residential projects still under way within 25 km. Step out ring by ring:
Of the 395 projects the radar draws within 6 km — every kind, every stage — 121 are residential projects still under way. This list keeps only those, and looks further out.