SIDDHI VINAYAK RESIDENCY
DEEPAKBHAI THAKORBHAI DESAI AND OTHERS · Choryasi
UPVAN VILLA
Timeline
0% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹3.10 Cr declared to build 114 plots. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
What this number is — and isn’t
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Has approved 895 RERA projects — about 1 in 19 in Gujarat.
a mixed market — 65% apartments · 35% plotted layouts.
More layout-heavy than Gujarat overall — 35% plots here vs 6% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
1 complaint
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | Date | |
|---|---|---|
| SMC/NCAR/ONLINE/Surat/05022026/00048 | 5 Feb 2026 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
420 plotted projects still under way within 25 km. Step out ring by ring:
Of the 524 projects the radar draws within 6 km — every kind, every stage — 125 are plotted projects still under way. This list keeps only those, and looks further out.
13 projects within 1 km — showing the nearest 6.
DEEPAKBHAI THAKORBHAI DESAI AND OTHERS · Choryasi
PATEL CHANDRIKABEN AND OTHERS · Choryasi
BHIKHUBHAI CHHAGANBHAI DESAI AND OTHERS · Choryasi
NAIK RAJESHKUMAR NARENDRABHAI AND OTHERS · Surat City
KAMLESHKUMAR BHAGUBHAI PATEL AND OTHERS · Choryasi
SAMARPAN DEVELOPERS · Choryasi
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you