Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
96 units across 2 batches
TypeArea sq mCount
2 BHK7248
2 BHK7248
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
District
Pune
Pincode
411057
Survey no.
S NO 144/4 - 144/5
North boundary
Land of Pandurang Wakadkar
East boundary
D P Road
South boundary
Land of Nandu Bhumkar
West boundary
S No 144-2
What’s nearby
SchoolsNearest school 1.1km away · 3 educational institutions within 1km · Library 1.9km away
HealthcareHospital 478m away · 1 clinic within 1km · Pharmacy within 500m
LifestylePark 2.0km away · Gym or sports centre 407m away · 48+ restaurants and cafes within 1km
Expressway 180 m · Mumbai - Satara HighwayPrimary road 16 m · Wakad FlyoverMetro station 312m away (Wakad Chowk metro Station)5 bus stops within 500m
Water & environment
River 721 m · Mula
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,228 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,926 projects the radar draws within 6 km — every kind, every stage — 606 are residential projects still under way. This list keeps only those, and looks further out.
23 projects within 1 km — showing the nearest 6.
WakadResidential / Group Housing
ANP ULTIMUS
SWADIK TRADE PRIVATE LIMITED
4 yr 7 mo
Nov 2022registered
Jun 2027target completion
Government Guidance Rate₹68,746/sq ydScale840 flatsAuthorityMahaRERA