The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Hinjavadi (CT)
Taluka
Mulshi
District
Pune
Pincode
411057
Survey no.
Sector EA1 , Survey No.119 part to 125 plus 154 part to 160 plus 160/2 to 171 plus 173 Plot No.1 and Survey No.106,111/1,112/4,113/1,113/2/1,113/2/2 and 114
North boundary
Utility Area MSEB
East boundary
24 Meter wide D P Road
South boundary
18 Meter wide Road
West boundary
24 Meter wide Road
What’s nearby
SchoolsNearest school 1.8km away · 3 educational institutions within 1km · College or university 683m away
HealthcareHospital 1.4km away · 1 clinic within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 1.0km away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 322m away · Mall 1.6km away · Convenience store within 500m
Getting around
Expressway 2.2 kmPrimary road 965 m · Hinjawadi Phase 1 roadMetro station 1.6km away (Jakat Naka)Bus stop within 500m
Water & environment
Water body 195 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Building Permit
Survey no. Sector EA1 , Survey No.119 part to 125 plus 154 part to 160 plus 160/2 to 171 plus 173 Plot No.1 and Survey No.106,111/1,112/4,113/1,113/2/1,113/2/2 and 114
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12401291
30 Dec 2024
Order Approveddisposed
Court cases, as declared
Declared by the builder
3 cases
Number
Forum
Date
9028/2017
Bombay High Court
2017
9029/2017
Bombay High Court
2017
WPST/6443/2016
Bombay High Court
2016
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
252 commercial projects still under way within 25 km. Step out ring by ring:
Of the 1,629 projects the radar draws within 6 km — every kind, every stage — 48 are commercial projects still under way. This list keeps only those, and looks further out.
10 projects between 1 and 3 km — showing the nearest 6.