HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

AAYESHA PALACE

P51900023852 · MahaRERA · https://gethorizon.in/projects/aayesha-palace-parel-mumbai-city-b34p5wmn

01

Complete project overview

MahaRERA · Registration filing
Units
162 units
Floors
23
Buildings
2
Parking
1 spaces
Land area
769 sq m
Sanctioned built-up
5,866 sq m

Timeline

RERA registeredJan 2020
Proposed completionDec 2023
TodaySep 2026
Construction progress
Fire protection an…0%
Water Supply50%
Sewerage (Chamber,…50%
Electrical meter r…50%
Water conservation…90%
Flat fit-out95%
Stairs & lifts95%
External finishes95%
OC-readiness95%
Excavation100%
Basement (if any)100%
Podiums100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Storm Water Drains100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

ZOEB ENTERPRISES

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1Cities
2020–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 144 new projects last year
  • 1,216 nearby projects
1 km radius · coordinates as filed · 19.0070, 72.8396 · © OpenStreetMap contributors
District
Mumbai City
Pincode
400012
Survey no.
23, DADAR NAIGAON DIVISION
North boundary
BMC QUARTERS
East boundary
RABIA BLDG
South boundary
ADAM MISTRY LANE
West boundary
PARSI COLONY
What’s nearby
Schools3 schools within 1km · 4 educational institutions within 1km · College or university 1.2km away
HealthcareHospital 437m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 1.3km away · Gym or sports centre 825m away
ShoppingSupermarket 1.5km away · Mall 1.5km away · Bank 39m away
Getting around
Expressway 109 m · Hindmata FlyoverPrimary road 647 m · Senapati Bapat MargRailway line 305 mRailway station 346m away (Parel)7 bus stops within 500m
Water & environment
Water body 461 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~20 m of the recorded location in 2016 (about 16 m), 76 m in 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 23, DADAR NAIGAON DIVISION

The promised possession date (30 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

3,054 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,216 projects the radar draws within 6 km — every kind, every stage — 452 are residential projects still under way. This list keeps only those, and looks further out.

19 projects within 1 km — showing the nearest 6.

110 m awayResidential / Group Housing

Pristine Heights

GOLD SUKH LIFESCAPES LLP · Parel

May 2023registered
Mar 2026target completion
Scale30 flatsAuthorityMahaRERA
110 m awayOthers

THE PINNACLE

RATNARAJ BLESSING MILESTONE LLP · CURREY ROAD

Apr 2024registered
Sep 2028target completion
Scale342 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

NIRBAN AVENUE 1

NIRBAN HOUSING AND DEVELOPMENT LLP · mumbai

May 2024registered
Dec 2028target completion
Scale76 flatsAuthorityMahaRERA
410 m awayOthers

Ratan Infinia

Shree Shankheshwar Enterprises · Dadar Naigaon Division

Apr 2023registered
Dec 2026target completion
Scale120 flatsAuthorityMahaRERA
430 m awayResidential / Group Housing

SHREEJI SERENITY

SPACE INFRA · Mumbai City

Feb 2025registered
Mar 2028target completion
Scale67 flatsAuthorityMahaRERA
450 m awayOthers

KINJAL PRIDE

Hi Rock Construction Pvt Ltd · PAREL

Oct 2023registered
Oct 2026target completion
Scale73 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • Complaints before MahaRERA.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/aayesha-palace-parel-mumbai-city-b34p5wmn.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.