These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
By Gat no 69 owned by Dattu Genu and GAT no 59Part
South boundary
By GAT no 60 owned byVitthal Sayaji Hagawane
West boundary
By Government Nala
What’s nearby
Schools1 school within 500m
HealthcareHospital 977m away · 4 clinics within 1km
LifestylePark 1.1km away · Gym or sports centre 971m away · 8 restaurants and cafes within 1km
ShoppingSupermarket 391m away · Mall 1.1km away · Convenience store within 500m
Getting around
Expressway 3.7 km · Sinhgad Road exitPrimary road 172 m · Narveer Tanaji Malusare RoadNo metro or railway within 5km3 bus stops within 500m
Water & environment
Canal 837 m · Mutha Right Bank CanalRiver 1.9 km · MuthaWater body 2.2 km
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹39,783per sq yd
₹47,580per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “KIRKATWADI”.
In force
2026-2027 schedule
Spread
₹26,371 – ₹43,763 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Pune Metropolitan Region Development Authority
Metropolitan Development Authority
Building Permit
Survey no. GAT NO 59A
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Pune Metropolitan Region Development Authority
Metropolitan / development authority
Has approved 1,013 RERA projects — about 1 in 20 in Maharashtra.
an apartments market — 87% apartments · 13% plotted layouts. Apartments like yours are this body's core business.
Builders
604
On record
21,940 flats · 10,299 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,819 residential projects still under way within 25 km. Step out ring by ring:
Of the 602 projects the radar draws within 6 km — every kind, every stage — 198 are residential projects still under way. This list keeps only those, and looks further out.
9 projects within 1 km — showing the nearest 6.
KIRKATWADIResidential / Group Housing
Atharva Aura
Hira Developers
4 yr 4 mo
Aug 2026registered
Dec 2030target completion
Government Guidance Rate₹39,783/sq ydScale56 flatsAuthorityMahaRERA