Complete project overview

RERA Telangana · Registration filing
Units
24 units
Unit mix
24 × 3BHK
Saleable area
131–165 sq mper unit, as filed
Floors
5
Land area
861 sq m
Built-up area
1,907 sq m

Timeline

RERA approvedMay 2018
Proposed completionMay 2024
TodayJul 2026
Construction progress

75.5% overall, as filed

Basement & plinth0%
Podiums0%
Stairs & lifts80%
Stilt floor90%
OC-readiness90%
Flat fit-out95%
Excavation100%
Superstructure100%
Internal finishes100%
External finishes100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

24 of 24 available
BuildingFloorTypeArea sq mAvailable
Devulapally Residency13BHKmortgaged1471 of 1
Devulapally Residency13BHK1311 of 1
Devulapally Residency13BHKmortgaged1651 of 1
Devulapally Residency23BHK1471 of 1
Devulapally Residency23BHK1311 of 1
Devulapally Residency23BHK1651 of 1
Devulapally Residency33BHK1471 of 1
Devulapally Residency33BHK1311 of 1
Devulapally Residency33BHK1651 of 1
Devulapally Residency43BHK1471 of 1
Devulapally Residency43BHK1311 of 1
Devulapally Residency43BHK1651 of 1
Devulapally Residency53BHK1471 of 1
Devulapally Residency53BHK1311 of 1
Devulapally Residency53BHK16510 of 10

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

Vaddiraj Infrastructures Private Limited

CompanyPromoter type
Warangal Urban, TelanganaBased in
2Projects
2Cities
2018–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
34 homeson the public record across 2 projects
3,064 sq mbuilt-up filed
1,362 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
Matwada
Mandal
Warangal
District
Warangal Urban
Pincode
506002
North boundary
Existing Building
East boundary
Existing Building
South boundary
Existing Building
West boundary
9 m width road
What’s nearby
Schools3 schools within 500m · 13 educational institutions within 1km · College or university 240m away
HealthcareHospital 169m away · 18 clinics within 1km · Pharmacy within 1km
LifestylePark 1.6km away · Playground within 500m · 16+ restaurants and cafes within 1km
ShoppingSupermarket 295m away · Mall 246m away · Bank 278m away
Getting around
Expressway 514 mPrimary road 2.1 kmRailway line 1.4 kmRailway station 1.7km away (Warangal)Bus stop within 500m
Water & environment
Canal 1.5 kmWater body 1.7 km · chinna vaddepalli
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit

The promised possession date (9 May 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.