These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Edathala Grama Panchayath Aluva ErnakulamLocal body (LSGI)1 of 2 projects
Kaiparambu Grama Panchayath ThrissurLocal body (LSGI)this project1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
OLD SY NO.6/2, 5/2. RE SY NO.29/5-1, 29/12-1, 29/12-2, 29/11, 29/4-1
Patta no.
9069, 9216
What’s nearby
SchoolsNearest school 1.5km away · College or university 1.9km away · Library 855m away
HealthcareHospital 948m away · 1 clinic within 1km · Pharmacy within 1km
LifestylePark 1.0km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 286m away · Mall 1.2km away · Convenience store within 1km
Getting around
Primary road 769 m · Thrissur-Kuttipuram roadRailway line 4.1 km · Guruvayur-Thrissur LineNo metro or railway within 5kmBus stop within 500m
Water & environment
Water body 253 m · Kollannur KulamCanal 952 m · Vazhani Canal
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Kerala registration department
In Kerala it’s called the fair value.
No government guidance rate is shown for this project.
Kerala's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
K-RERA · Approved building plan
Kaiparambu Grama Panchayath Thrissur
Local body (LSGI)
approved 17 Jul 2025 · 1 yr ago
Layout Permit no. BP/52405/2025Survey no. OLD SY NO.6/2, 5/2. RE SY NO.29/5-1, 29/12-1, 29/12-2, 29/11, 29/4-1
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan BP/52405/2025 on the approving authority’s portal to confirm the approval.
The approving body, at scale
The local self-government (LSGI)
The local body that approved this project. It has approved 404 RERA projects across 14 districts — about 1 in 4 in Kerala.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
K-RERA · public record
Complaints register
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to K-RERA
Litigation
None declared in this filing
Only what the builder declared, or what K-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
28 plotted projects still under way within 25 km. Step out ring by ring:
Of the 23 projects the radar draws within 6 km — every kind, every stage — 11 are plotted projects still under way. This list keeps only those, and looks further out.
3 projects between 1 and 3 km — showing the nearest 3.
No government guidance rate could be matched to this project from Kerala's published schedules.
05Planning authority
K-RERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
K-RERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/dharmic-sanctum-6-anjoor-thrissur-gidlnmxl.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.