EUPHORIA

PM1170002501056 · MahaRERA · https://gethorizon.in/projects/euphoria-mumbai-city-gj7x29s1

01

Complete project overview

MahaRERA · Registration filing
Units
53 units
Floors
16
Buildings
2
Parking
39 spaces
Land area
754 sq m
Sanctioned built-up
3,016 sq m

Timeline

RERA registeredOct 2025
Proposed completionDec 2028
TodaySep 2026
Construction progress
Plinth0%
Superstructure0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Energy managemcnt0%
Fire protection an…0%
Electrical meter r…0%
OTHER (OPTION TO A…0%
Excavation5%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

ANUWRITA BUILDERS & DEVELOPERS LLP

Limited Liability PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2025–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400080
Survey no.
704/5A
North boundary
18.30 MTR WIDE ROAD CTS NO 704/2
East boundary
JYOTIRADITYA REALTORS & DEVELOPERS CTS NO 704/5B
South boundary
RAJA INDUSTRIES 707
West boundary
CTS NO 704A
What’s nearby
Schools1 school within 500m · College or university 1.2km away
HealthcareHospital 206m away · 11 clinics within 1km
LifestylePark 1.2km away · Gym or sports centre 1.9km away · 4 restaurants and cafes within 1km
ShoppingSupermarket 1.9km away · Mall 1.7km away · Convenience store within 1km
Getting around
Expressway 2.2 km · Eastern Express HighwayPrimary road 703 m · Lal Bahadur Shastri MargRailway line 1.1 kmRailway station 1.1km away (Bhandup)Bus stop within 500m
Water & environment
Water body 244 m · Shivaji Talao
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 704/5A
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,931 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,148 projects the radar draws within 6 km — every kind, every stage — 432 are residential projects still under way. This list keeps only those, and looks further out.

31 projects within 1 km — showing the nearest 6.

150 m awayResidential / Group Housing

Atlantis

GOLDENEON DEVELOPERS PRIVATE LIMITED · Bhandup · Kurla

Mar 2025registered
Dec 2033target completion
Government Guidance Rate₹1,22,936/sq ydScale374 flatsAuthorityMahaRERA
150 m awayOthers

SHARDA HEIGHTS

Shivshankar Singh & Others · Kanjurmarg · Kurla

Mar 2025registered
Dec 2028target completion
Government Guidance Rate₹1,15,845/sq ydScale41 flatsAuthorityMahaRERA
280 m awayResidential / Group Housing

MARATHON NEOVALLEY NARMADA WING C

M/S NEXZONE FISCAL SERVICES PVT LTD · Bhandup · Kurla

Mar 2026registered
Dec 2029target completion
Government Guidance Rate₹1,11,171/sq ydAuthorityMahaRERA
290 m awayResidential / Group Housing

Guineas HK RESIDENCY

Guinea Global NX · Bhandup · Mumbai

Nov 2024registered
Jan 2027target completion
Scale24 flatsAuthorityMahaRERA
290 m awayResidential / Group Housing

Vecepia CHS

SHREE SWAMI SAMARTH BUILDERS & DEVELOPERS · Kanjurmarg · Kurla

Aug 2023registered
Dec 2028target completion
Government Guidance Rate₹1,15,845/sq ydScale140 flatsAuthorityMahaRERA
390 m awayResidential / Group Housing

MARATHON NEOVALLEY KAVERI WING B

M/S NEXZONE FISCAL SERVICES PVT LTD · Kurla

Nov 2020registered
Jun 2026target completion
Scale293 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.