The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Greater Mumbai (M Corp.) (Part) (802794)
Taluka
Mumbai
District
Mumbai Suburban
Pincode
400052
Survey no.
CTS No E/572, of Village Bandra East Taluka Andheri Khar S V Road Khar (W), Mumbai-400052
North boundary
Fida Mansion
East boundary
S V Road
South boundary
Gulmohar CHS
West boundary
Urmi CHS
What’s nearby
Schools1 school within 1km · College or university 1.1km away
HealthcareHospital 274m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 536m away · Gym or sports centre 1.6km away · 9 restaurants and cafes within 1km
ShoppingSupermarket 549m away · Convenience store within 500m · Bank 571m away
Getting around
Expressway 336 mPrimary road 663 m · Swami Vivekanand RoadRailway line 224 mRailway station 442m away (Khar Road)2 bus stops within 500m
Water & environment
Canal 691 mWater body 823 m · Vakola Nala
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹2,86,156per sq yd
₹3,42,240per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Bandra East”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CTS No E/572, of Village Bandra East Taluka Andheri Khar S V Road Khar (W), Mumbai-400052
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,685 residential projects still under way within 25 km. Step out ring by ring:
Of the 2,264 projects the radar draws within 6 km — every kind, every stage — 816 are residential projects still under way. This list keeps only those, and looks further out.