HORIZON
Share

Grace Pinnacle

P51800007498 · MahaRERA · https://gethorizon.in/projects/grace-pinnacle-andheri-mtcgh2u7

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Grace Pinnacle
Units
78 units
Floors
18
Buildings
2
Parking
34 spaces
Land area
3,423 sq m
Sanctioned built-up
5,553 sq m
Recreational open space
514 sq m

Timeline

RERA registeredAug 2017
Proposed completionJun 2019
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Grace Estate Builders

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2017–2019Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400058
Survey no.
151 part, 151/23-37, 151/71-149
North boundary
Dadabhai Navroji Cross Road 1
East boundary
CTS 151
South boundary
Tehsildar Office
West boundary
Sai Laxmi CHS
What’s nearby
Schools2 schools within 1km · Library 2.0km away
HealthcareHospital 397m away · 7 clinics within 1km · Pharmacy within 500m
LifestylePark 932m away · Gym or sports centre 1.4km away · 15+ restaurants and cafes within 1km
ShoppingSupermarket 338m away · Mall 1.2km away · Bank 105m away
Getting around
Expressway 1.7 kmPrimary road 807 m · Swami Vivekanand RoadRailway line 851 m · Central Railway (Harbour Line)Metro station 906m away (Andheri (West))3 bus stops within 500m
Water & environment
Water body 338 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 151 part, 151/23-37, 151/71-149

The promised possession date (30 Jun 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,623 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,082 projects the radar draws within 6 km — every kind, every stage — 708 are residential projects still under way. This list keeps only those, and looks further out.

49 projects within 1 km — showing the nearest 6.

80 m awayOthers

UMAR PARK

ARY DEVELOPERS · Andheri

Nov 2023registered
Jun 2026target completion
Scale59 flatsAuthorityMahaRERA
160 m awayOthers

JP Eminence

JP Infra (Mumbai) Pvt. Ltd. · Andheri

Sep 2020registered
Jun 2026target completion
1 open complaintScale102 flatsAuthorityMahaRERA
230 m awayResidential / Group Housing

PRANAMI BLISS

Pranami Neev Realty Limited · Ambivali · Andheri

Jul 2024registered
Apr 2027target completion
Government Guidance Rate₹1,78,848/sq ydAuthorityMahaRERA
240 m awayResidential / Group Housing

NAUMI SHRESHT

NAUMI DEVELOPERS · Andheri

Jun 2024registered
Mar 2027target completion
Scale142 flatsAuthorityMahaRERA
240 m awayOthers

BOSTON HARBOR

VERDENT INFRA BULTCON · Andheri

Feb 2025registered
Sep 2027target completion
Scale69 flatsAuthorityMahaRERA
280 m awayOthers

5TH ELEMENT

PRATHAM VARADVINAYAK BUILDERS AND DEVELOPERS PRIVATE LIMITED · Andheri

May 2023registered
Jun 2026target completion
Scale84 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.