HORIZON
Share

AADHAYAY

P51800020623 · MahaRERA · https://gethorizon.in/projects/aadhayay-andheri-k4h8zpf1

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
AADHAYAY
Units
74 units
Mix
43 × 1 BHK · 30 × 2 BHK · 1 × 3 BHK
Carpet area
26–91 sq mper-unit range, as filed
Floors
19
Parking
96 spaces
Land area
926 sq m
Sanctioned built-up
3,017 sq m

Timeline

RERA registeredApr 2019
Proposed completionDec 2024
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

74 units across 19 batches
TypeArea sq mCount
2 BHK504
1 BHK281
1 BHK301
1 BHK321
1 BHK337
1 BHK3811
1 BHK412
1 BHK429
1 BHK436
1 BHK263
1 BHK452
2 BHK511
2 BHK512
2 BHK581
2 BHK629
2 BHK6610
2 BHK662
2 BHK711
3 BHK911

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

Sheth Creators and Harileela Projects Pvt Ltd

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2019–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400053
Survey no.
195 PT
North boundary
Plot 29 DHL Building
East boundary
The Club
South boundary
Plot 31 Platinum Building
West boundary
12 Mtr wide D N Nagar Road
What’s nearby
Schools1 school within 500m
HealthcareHospital 623m away · 4 clinics within 1km · Pharmacy within 1km
LifestylePark 1.5km away · Gym or sports centre 514m away · 20+ restaurants and cafes within 1km
ShoppingSupermarket 700m away · Mall 889m away · Convenience store within 1km
Getting around
Expressway 2.5 kmPrimary road 164 m · Link RoadRailway line 1.6 km · Central Railway (Harbour Line)Metro station 820m away (Andheri (West))6 bus stops within 500m
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Other projects nearby

The register · within 25 km

3,585 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,036 projects the radar draws within 6 km — every kind, every stage — 689 are residential projects still under way. This list keeps only those, and looks further out.

30 projects within 1 km — showing the nearest 6.

180 m awayResidential / Group Housing

ATHENA

ASTRUM DEVELOPERS · Andheri

Jul 2025registered
Aug 2027target completion
Scale67 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

Nest Wing B

M86 Residency Private Limited · Andheri

Feb 2026registered
Mar 2030target completion
Scale52 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

UMANG HEIGHTS

L K INFRACON LLP · Andheri

Nov 2021registered
Aug 2026target completion
Scale106 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

Park Altezza

SHREE MAHAVIR ESTATE AMEYA · Andheri

Jun 2022registered
Dec 2029target completion
Scale138 flatsAuthorityMahaRERA
180 m awayResidential / Group Housing

Awestrum Life

TRU SUN-VISION REALTY LLP · Andheri

Sep 2023registered
Jul 2027target completion
AuthorityMahaRERA
180 m awayResidential / Group Housing

PARK GRANDEZZA

SHREE MAHAVIR ESTATES · Andheri

Jun 2024registered
Feb 2034target completion
Scale140 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.