HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

PEARL HERITAGE

P51800010436 · MahaRERA · https://gethorizon.in/projects/pearl-heritage-andheri-z9x4fs3b

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
35 units
Mix
28 × 3 BHK · 7 × 2 BHK
Carpet area
49–78 sq mper-unit range, as filed
Floors
9
Buildings
2
Parking
32 spaces
Land area
1,437 sq m
Sanctioned built-up
1,899 sq m

Timeline

RERA registeredAug 2017
Proposed completionDec 2022
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

35 units across 5 batches
TypeArea sq mCount
3 BHK787
3 BHK787
3 BHK787
3 BHK777
2 BHK497

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

MahaRERA · Builder registration

HARI OM CONSTRUCTION

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
5Projects
4Cities
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
242 homeson the public record across 5 projects
10,171 sq mbuilt-up filed
12,798 sq mland declared
₹8.95 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Urban Development AuthorityUrban Development Authority1 of 3 projects
Chiloda Gram Panchayat1 of 3 projects
Kalyan Dombivli Municipal CorporationMunicipal Corporation1 of 3 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from HARI OM CONSTRUCTION— the full portfolio →

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 208 new projects last year
  • 2,135 nearby projects
1 km radius · coordinates as filed · 19.1240, 72.8446 · © OpenStreetMap contributors
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400057
Survey no.
196 AND 199
North boundary
CTS NO 200
East boundary
KOLDONGARI ROAD
South boundary
INTERNAL ROAD AND CTS NO 198
West boundary
CTS NO 195 AND 259
What’s nearby
Schools1 school within 500m
HealthcareHospital 247m away · 16 clinics within 1km · Pharmacy within 1km
LifestylePark 718m away · Gym or sports centre 1.9km away · 17+ restaurants and cafes within 1km
ShoppingSupermarket 630m away · Mall 1.8km away · Convenience store within 1km
Getting around
Expressway 1.2 kmPrimary road 219 m · Swami Vivekanand RoadRailway line 261 m · Central Railway (Harbour Line)Railway station 515m away (Andheri)4 bus stops within 500m
Water & environment
Water body 807 m
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

A building already stood within ~21 m of the recorded location in 2016 (about 32 m), 30 m in 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~21 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Feb 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • A building is first visible in 2016.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~21 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

07

Other projects nearby

The register · within 25 km

3,692 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,135 projects the radar draws within 6 km — every kind, every stage — 721 are residential projects still under way. This list keeps only those, and looks further out.

62 projects within 1 km — showing the nearest 6.

60 m awayResidential / Group Housing

TATHASTU

H&D PROJECTS · Andheri

Nov 2023registered
Jul 2026target completion
Scale32 flatsAuthorityMahaRERA
110 m awayResidential / Group Housing

153 EAST

DASADIA DEVELOPERS LLP · Sahar · Andheri

Mar 2026registered
Dec 2028target completion
Government Guidance Rate₹1,42,033/sq ydScale72 flatsAuthorityMahaRERA
120 m awayResidential / Group Housing

CHANDRA LOGASSA

AMAAN GOLD LEAF DEVELOPERS · Greater Mumbai · Mumbai

Sep 2025registered
Aug 2028target completion
Scale105 flatsAuthorityMahaRERA
150 m awayResidential / Group Housing

MASS IONICS

MASS BUILDSQUARE STRUCTURE PRIVATE LIMITED · Andheri

Dec 2020registered
Jun 2026target completion
Scale86 flatsAuthorityMahaRERA
170 m awayResidential / Group Housing

MAYFAIR BREEZE

MAYFAIR HOUSING PRIVATE LIMITED · Andheri

Jan 2024registered
Nov 2027target completion
Scale109 flatsAuthorityMahaRERA
220 m awayOthers

MIRAI

Graceunited Developers · Andheri

Aug 2023registered
Mar 2027target completion
Scale65 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Complaints & litigation
    • Complaints before MahaRERA.
    • Orders said not to be complied with: MahaRERA's own register.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/pearl-heritage-andheri-z9x4fs3b.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.