Building No 2 Pearl Regency Phase 1

P51800029784 · MahaRERA · https://gethorizon.in/projects/building-no-2-pearl-regency-phase-1-andheri-m1mwx8z0

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Project name
Building No 2 Pearl Regency Phase 1
Units
103 units
Floors
10
Buildings
2
Parking
36 spaces
Land area
4,717 sq m
Sanctioned built-up
5,002 sq m
Recreational open space
411 sq m

Timeline

RERA registeredJun 2021
Proposed completionMar 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

Prime Infrabuildcon Pvt. Ltd.

CompanyPromoter type
Mumbai Suburban, MAHARASHTRABased in
2Projects
1City
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
240 homeson the public record across 2 projects
10,005 sq mbuilt-up filed
9,433 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from Prime Infrabuildcon Pvt. Ltd.— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400058
Survey no.
815pt
North boundary
bearing CTS No 815 pt
East boundary
bearing CTS no 35 to 40 and 42 and 45
South boundary
bearing CTS No 66
West boundary
bearing CTS No 815 pt
What’s nearby
Schools1 school within 500m
HealthcareHospital 39m away · 26 clinics within 1km · Pharmacy within 500m
LifestylePark 641m away · Gym or sports centre 1.9km away · 21+ restaurants and cafes within 1km
ShoppingSupermarket 710m away · Convenience store within 500m · Bank 549m away
Getting around
Expressway 1.1 kmPrimary road 16 m · Swami Vivekanand RoadRailway line 121 m · Central Railway (Harbour Line)Railway station 118m away (Andheri)8 bus stops within 500m
Water & environment
Water body 788 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilation Authority

Building Permit
Survey no. 815pt

The promised possession date (31 Mar 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilation Authority

Planning authority

Has approved 41 RERA projects0.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
36
On record
365 flats · 0 plots
Reach
2 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,685 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,244 projects the radar draws within 6 km — every kind, every stage — 780 are residential projects still under way. This list keeps only those, and looks further out.

58 projects within 1 km — showing the nearest 6.

AndheriResidential / Group Housing

Building No 2 Pearl Regency Phase 2

Prime Infrabuildcon Pvt. Ltd.

May 2022registered
Dec 2027target completion
Scale137 flatsAuthorityMahaRERA
VileparleResidential / Group Housing

MESACON CROWN

MESACON SPACES LLP

Apr 2024registered
Jun 2027target completion
Scale87 flatsAuthorityMahaRERA
AndheriMixed

Ananta

Jet Builders LLP

Oct 2024registered
Mar 2028target completion
Scale89 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

PEARL CASTLE

CHANDIWALA ENTERPRISES & EVEREST DEVELOPERS

Jul 2023registered
Dec 2026target completion
Scale24 flatsAuthorityMahaRERA
AndheriResidential / Group Housing

DMK Business Hub

LAXMI LEELA HOMESPACE LLP

Apr 2026registered
Dec 2029target completion
Scale6 flatsAuthorityMahaRERA
AndheriOthers

KAMLA CHANDRA RASHMI

KAMLA HOMES & LIFESTYLES PRIVATE LIMITED

Apr 2024registered
Dec 2027target completion
Scale36 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.