Green Emerald
SHREENATHJI BUILDER · Vapi
Jaivik Complex
Timeline
100% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.









₹2.91 Cr declared to build 24 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Open ground on the plot until 2020; a building is first visible in 2021 and is about 19 m tall by 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (31 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The body that approved this project. It has approved 2,653 RERA projects across 26 talukas — about 1 in 6 in Gujarat.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
1 complaint
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | Date | |
|---|---|---|
| SMC/NCQER/ONLINE/Valsad/01062024/00262 | 1 Jun 2024 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
136 residential projects still under way within 25 km. Step out ring by ring:
Of the 100 projects the radar draws within 6 km — every kind, every stage — 43 are residential projects still under way. This list keeps only those, and looks further out.
13 projects within 1 km — showing the nearest 6.
SHREENATHJI BUILDER · Vapi
MF ENTERPRISE · Vapi
SAI REALITY · Pardi
SHREE VINAYAK DEVELOPERS · Pardi
M M LAKE CITY DEVELOPERS · Pardi
MUSA FORTUNE · Pardi
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/jaivik-complex-pardi-nthi2r0p.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.