01

Complete project overview

JHARERA · Registration filing
Units
20 units
Carpet area
59–94 sq mper unit, as filed
Parking
22 spaces17 covered · 5 open
Amenities declared
Road · Drinking water · Water supply · Sewage & drainage · Electricity · Fire fighting · Emergency evacuation · Solid waste · Rain-water harvesting · Renewable energy

Timeline

Building permit grantedSep 2020
Proposed completionApr 2023
TodaySep 2026

Find your flat

Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.

UnitCarpet sq m
FLAT AFIRST FLOOR88.58
FLAT BFIRST FLOOR78.52
FLAT CFIRST FLOOR60.30
FLAT DFIRST FLOOR58.86
FLAT EFIRST FLOOR75.92
FLAT A1SECOND FLOOR94.04
FLAT B1SECOND FLOOR78.52
FLAT C1SECOND FLOOR60.30
FLAT D1SECOND FLOOR58.86
FLAT E1SECOND FLOOR79.27
FLAT A2THIRD FLOOR94.04
FLAT B2THIRD FLOOR78.52
FLAT C2THIRD FLOOR60.30
FLAT D2THIRD FLOOR58.86
FLAT E2THIRD FLOOR79.27
FLAT A3FOURTH FLOOR94.04
FLAT B3FOURTH FLOOR78.52
FLAT C3FOURTH FLOOR60.30
FLAT D3FOURTH FLOOR58.86
FLAT E3FOURTH FLOOR79.27

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.

02

Builder’s track record

JHARERA · Builder registration

PAWANI INFRASTRUCTURE AND DEVELOPER

Company (Pvt / Public Ltd)Promoter constitution
2Projects
2Cities
2020–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
44 homeson the public record across 2 projects
3,396 sq mbuilt-up filed
₹2.10 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from PAWANI INFRASTRUCTURE AND DEVELOPER— the full portfolio →

03

Location

JHARERA · Registration filing
District
Ranchi
Circle (Anchal)
Kanke
Village
ARSANDAY
Address
BEHIND SHIV MANDIR,BOREYA,
Plot no.
1357
Khata no.
250
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 529m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 2.2 km · Ranchi Ring RoadRailway line 4.3 km · Barkakana Junction - Tatisilwai Railway LineNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 780 m · Potpoto Nadi
distances only — not a flood assessment
04

Government Guidance Rate

Jharkhand registration department

In Jharkhand it’s called the MVR (minimum value register) rate.

No government guidance rate is shown for this project.

Jharkhand's government guidance rates aren't in Horizon's record yet.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

JHARERA · Approved building plan
Building Permitapproved 16 Sep 2020 · 6 yrs ago

The promised possession date (21 Apr 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

282 residential projects still under way within 25 km. Step out ring by ring:

Of the 188 projects the radar draws within 6 km — every kind, every stage — 93 are residential projects still under way. This list keeps only those, and looks further out.

2 projects within 1 km — showing the nearest 2.

170 m awayResidential

CASA -15

MAA AMBEY CONSTRUCTION · Ratu

Jun 2022registered
Apr 2028target completion
possession revisedDeclared cost₹2.00 CrScale15 flatsAuthorityJHARERA
170 m awayMixed

ONE

PRATISHTHA SUPER BUILDCON PRIVATE LIMITED · Kanke

Nov 2022registered
Apr 2027target completion
Declared cost₹15.00 CrScale43 flatsAuthorityJHARERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — JHARERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — JHARERA does not publish a complaints register. This read cannot speak to them either way.