This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.
01
Complete project overview
MahaRERA · Registration filing
Project name
Kohinoor Prime
Units
342 units
Mix
217 × 1 BHK · 99 × 2 BHK · 14 × 1 RK · 12 × Shop
Carpet area
20–69 sq mper-unit range, as filed
Floors
14
Buildings
2
Parking
82 spaces
Land area
4,600 sq m
Sanctioned built-up
19,133 sq m
Recreational open space
460 sq m
Timeline
RERA registeredFeb 2022
Proposed completionDec 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
342 units across 23 batches
TypeArea sq mCount
2 BHK4728
2 BHK4914
2 BHK4914
2 BHK5014
Shop201
Shop311
Shop341
Shop411
Shop421
Shop432
Shop471
Shop531
Shop621
Shop691
1 RK2214
1 BHK3712
1 BHK3783
Shop361
1 BHK37108
2 BHK4914
2 BHK491
2 BHK4814
1 BHK3914
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 440m away · 2 clinics within 1km
LifestylePark 1.7km away
ShoppingNo supermarket within 2km
Getting around
Expressway 316 m · Ahilyanagar - Kalyan Road | Bhiwandi - Murbad Road | B K Birla RoadPrimary road 357 m · Shahad Station RoadRailway line 305 m · Mumbai–Nagpur RailwayRailway station 379m away (Shahad)Limited bus connectivity nearby
Water & environment
River 776 m · Waldhuni River
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
Open ground within ~38 m of the recorded location until 2022; a building is first visible in 2023 and is about 46 m tall by 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~38 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2023.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~38 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12502380
13 Jul 2025
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,525 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,482 projects the radar draws within 6 km — every kind, every stage — 556 are residential projects still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Maharashtra's published schedules.
06Complaints & litigation
Complaints before MahaRERA.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kohinoor-prime-ulhasnagar-m-corp-3p2u5abv.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.