These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SURVEY NO 42A, HISSA NO 19/A/3 CTS No. 7273 TO 7276, SURVEY No. 42/A, HISSA No. 19/A/8 CTS No.7277 TO 7280, SURVEY No 42/A, HISSA No 19/A/6, SURVEY NO 130 HISSA No. 3A/1 CTS No 7281 TO 7283
North boundary
73 08 40 8
East boundary
19 14 39 9
South boundary
0
West boundary
0
What’s nearby
SchoolsNo schools within 2km · College or university 1.7km away
HealthcareHospital 154m away · 3 clinics within 1km
LifestylePark 1.7km away
ShoppingNo supermarket within 2km
Getting around
Expressway 326 m · Kalyan-Murbad RoadPrimary road 384 m · Kalyan-Murbad RoadRailway line 517 mRailway station 1.4km away (Shahad)Limited bus connectivity nearby
Water & environment
River 784 m · Waldhuni RiverWater body 977 m
distances only — not a flood assessment
Location — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~20 m of the recorded location in 2017 — before this project started in 2023. The yearly view ends in 2023, so it does not cover this project's own construction; see the 2026 image.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Mar 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2017.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
The yearly site view ends in 2023, before this project started in 2023.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹63,295per sq yd
₹75,700per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Chikanghar”.
In force
2026-2027 schedule
Spread
₹57,107 – ₹69,231 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
MahaRERA · Approved building plan
Kalyan Dombivli Municipal Corporation
Municipal Corporation
Building Permit
Survey no. SURVEY NO 42A, HISSA NO 19/A/3 CTS No. 7273 TO 7276, SURVEY No. 42/A, HISSA No. 19/A/8 CTS No.7277 TO 7280, SURVEY No 42/A, HISSA No 19/A/6, SURVEY NO 130 HISSA No. 3A/1 CTS No 7281 TO 7283
The promised possession date (30 Jul 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Kalyan Dombivli Municipal Corporation
Municipal corporation
Has approved 742 RERA projects — 3.7% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
585
On record
5,683 flats · 0 plots
Reach
2 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
2,553 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,368 projects the radar draws within 6 km — every kind, every stage — 539 are residential projects still under way. This list keeps only those, and looks further out.
45 projects within 1 km — showing the nearest 6.
80 m awayOthers
SHIRISH RESIDENCY
RL CONSTRUCTIONS · Chikanghar · Kalyan
2 yr 1 mo
Nov 2024registered
Dec 2026target completion
Government Guidance Rate₹63,295/sq ydScale16 flatsAuthorityMahaRERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates.
06Planning authority
MahaRERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
MahaRERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/vaishnavi-heights-chikanghar-kalyan-wv9pxz54.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.