KUBER VILLA

P51800054808 · MahaRERA · https://gethorizon.in/projects/kuber-villa-vileparle-andheri-k2718epg

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
15 units
Floors
14
Buildings
2
Parking
1 spaces
Land area
702 sq m
Sanctioned built-up
2,589 sq m

Timeline

RERA registeredFeb 2024
Proposed completionJun 2026
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

M/s. LOTUS VENTURES LLP

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2024–2026Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Vileparle
Taluka
Andheri
District
Mumbai Suburban
Pincode
400056
Survey no.
305
North boundary
PLOT BEARING NO 1
East boundary
PLOT BEARING NO 8
South boundary
PLOT BEARING NO 3
West boundary
60 FEET WIDE ROAD
What’s nearby
SchoolsNearest school 1.5km away · Library 1.5km away
HealthcareHospital 134m away · 7 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 827m away · 42+ restaurants and cafes within 1km
ShoppingSupermarket 265m away · Bank 470m away · ATM within 500m
Getting around
Expressway 2.4 kmPrimary road 319 m · Gulmohar RoadRailway line 1.1 km · Central Railway (Harbour Line)Railway station 1.1km away (Vile Parle)7 bus stops within 500m
Water & environment
Water body 407 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹2,71,265per sq yd
₹3,24,430per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Vileparle”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 305

The promised possession date (30 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,587 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,035 projects the radar draws within 6 km — every kind, every stage — 745 are residential projects still under way. This list keeps only those, and looks further out.

43 projects within 1 km — showing the nearest 6.

100 m awayResidential / Group Housing

EDEN 62

EKTA NAGPAL VENTURES LLP · Juhu · Andheri

Jul 2024registered
Dec 2026target completion
Government Guidance Rate₹3,52,862/sq ydScale10 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

ATLANTIS

NHP CONSTRUCTION LLP · Juhu · Andheri

May 2024registered
Dec 2027target completion
Government Guidance Rate₹3,21,140/sq ydScale12 flatsAuthorityMahaRERA
400 m awayResidential / Group Housing

MESACON BLISS

VIKRAM RASHMIKANT MEHTA · Vileparle · Andheri

Jul 2025registered
May 2028target completion
Scale14 flatsAuthorityMahaRERA
440 m awayResidential / Group Housing

CENTRAL PARK

SHREE MAHAVIR DEVELOPERS · Vileparle · Andheri

Dec 2024registered
Dec 2029target completion
Government Guidance Rate₹2,17,050/sq ydScale14 flatsAuthorityMahaRERA
440 m awayResidential / Group Housing

ASHISH

bhoomi realty and developers llp · Juhu · Andheri

Jun 2025registered
Jul 2027target completion
Government Guidance Rate₹3,73,247/sq ydScale9 flatsAuthorityMahaRERA
530 m awayMixed

Imperial Landmark

Neminath and Disha Realtors · Vileparle · Andheri

Jan 2026registered
Dec 2031target completion
Government Guidance Rate₹2,09,241/sq ydScale84 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.