KUSUM EKDANT

P99000046825 · MahaRERA · https://gethorizon.in/projects/kusum-ekdant-tembhode-palghar-ioq2usvk

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
39 units
Floors
8
Buildings
2
Parking
49 spaces
Land area
1,000 sq m
Sanctioned built-up
2,315 sq m

Timeline

RERA registeredSep 2022
Proposed completionJun 2024
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

JOLLITY EKDANT DEVELOPERS

PartnershipPromoter type
Palghar, MAHARASHTRABased in
1Projects
1City
2022–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 47 new projects last year
  • 667 nearby projects
1 km radius · coordinates as filed · 19.7028, 72.7540 · © OpenStreetMap contributors
Taluka
Palghar
District
Palghar
Pincode
401404
Survey no.
SURVEY NO-119/2/B/2
North boundary
SURVRY NO-119
East boundary
DP ROAD
South boundary
PLOT
West boundary
SURVEY N0-89
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 928m away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.4 kmPrimary road 963 mRailway line 1.8 kmRailway station 1.9km away (Palghar)Limited bus connectivity nearby
Water & environment
Water body 1.0 kmRiver 3.2 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Maharashtra's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Palghar Municipal Council

Municipal Council
Building Permit
Survey no. SURVEY NO-119/2/B/2

The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Palghar Municipal Council

Municipal corporation

Has approved 94 RERA projects0.5% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
86
On record
209 flats · 0 plots
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

351 residential projects still under way within 25 km. Step out ring by ring:

Of the 667 projects the radar draws within 6 km — every kind, every stage — 191 are residential projects still under way. This list keeps only those, and looks further out.

29 projects within 1 km — showing the nearest 6.

10 m awayResidential / Group Housing

SAI HANEESHA

GHODELA PROPERTIES · Palghar

Dec 2023registered
Dec 2028target completion
Government Guidance Rate₹29,766/sq ydScale37 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

RAJYOG GARDENS

RAJYOG INFRA · Palghar

Jun 2024registered
Dec 2027target completion
Government Guidance Rate₹29,766/sq ydScale108 flatsAuthorityMahaRERA
10 m awayMixed

SHREE GURUDATTA HEIGHTS

FUTURE BUILDCOM · Tembhode · Palghar

Apr 2026registered
Dec 2030target completion
Scale142 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

PRIME PARK RESIDENCY

SEVEN SQUARE · Tembhode · Palghar

Feb 2026registered
Dec 2028target completion
Scale92 flatsAuthorityMahaRERA
10 m awayMixed

NIVAAS AVENUE

NIVAAS REALTOR · Tembhode · Palghar

May 2026registered
Dec 2030target completion
Scale52 flatsAuthorityMahaRERA
10 m awayResidential / Group Housing

GHODELA 27 PARK VIEW PHASE 2

SUBHASH CONSTRUCTION · Tembhode · Palghar

Aug 2026registered
Dec 2030target completion
Scale17 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  5. 05Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kusum-ekdant-tembhode-palghar-ioq2usvk.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.