Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
312 units across 60 batches
BuildingFloorTypeArea sq mCount
A13 BHK4114
A23 BHK4114
A33 BHK4114
A43 BHK4124
A53 BHK4124
A63 BHK4124
A73 BHK4124
A83 BHK4124
A93 BHK4124
A103 BHK4124
A113 BHK4124
A123 BHK4124
B13 BHK4114
B23 BHK4114
B33 BHK4114
B43 BHK4124
B53 BHK4124
B63 BHK4124
B73 BHK4124
B83 BHK4124
B93 BHK4124
B103 BHK4124
B113 BHK4124
B123 BHK4124
CGF2 BHK4466
C12 BHK4636
C22 BHK4636
C32 BHK4636
C42 BHK4636
C52 BHK4636
C62 BHK4636
C72 BHK4636
C82 BHK4636
C92 BHK4636
C102 BHK4636
C112 BHK4636
DGF2 BHK4466
D12 BHK4636
D22 BHK4636
D32 BHK4636
D42 BHK4636
D52 BHK4636
D62 BHK4636
D72 BHK4636
D82 BHK4636
D92 BHK4636
D102 BHK4636
D112 BHK4636
EGF2 BHK4466
E12 BHK4636
E22 BHK4636
E32 BHK4636
E42 BHK4636
E52 BHK4636
E62 BHK4636
E72 BHK4636
E82 BHK4636
E92 BHK4636
E102 BHK4636
E112 BHK4636
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 783 m · Shaheed PathPrimary road 2.7 km · Sultanpur RoadRailway line 1.7 km · Varanasi–Sultanpur–Lucknow lineRailway station 2.7km away (Utrahtia)Limited bus connectivity nearby
Water & environment
Water body 296 mCanal 1.8 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹67.70 Cr declared to build 312 flats. What that works out to:
₹21.70 Lakhdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
A building already stood within ~40 m of the recorded location in 2016 (about 28 m), 26 m in 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Apr 2017Mar 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
A building is first visible in 2016.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Uttar Pradesh registration department
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
UP-RERA · Approved building plan
approved 20 Jul 2015 · 11 yrs ago
Building Permit no. 38522
The promised possession date (17 Oct 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 38522 on the approving authority’s portal to confirm the approval.
Planning authority — done
07
Complaints & litigation
UP-RERA · public record
Complaints register
14 complaints on UP-RERA’s register for this project.
A count from the authority’s public register — not a judgement. A disposed complaint may have been resolved for or against the builder, and only disputes escalated this far appear at all.
Across this builder's projects in UP
UP-RERA's own register
Complaints against the builder
19
Its projects on UP RERA
1
UP RERA's own count across every project this builder has registered — not this project's alone.
What the builder declared
Declared to UP-RERA
Litigation
None declared in this filing
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
117 residential projects still under way within 25 km. Step out ring by ring:
Of the 288 projects the radar draws within 6 km — every kind, every stage — 39 are residential projects still under way. This list keeps only those, and looks further out.
10 projects between 1 and 3 km — showing the nearest 6.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Uttar Pradesh's published schedules.
06Planning authority
UP-RERA: the approved building plan, as filed.
07Complaints & litigation
Across this builder's projects in UP: UP-RERA's own register.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/lakshya-heights-mohanlalganj-lucknow-uil8zh9u.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.