188 × Unit No. 1-12 and 14-48 · 80 × Store · 69 × Unit No. 14-36 · 33 × Unit 49-81
Buildings
9
Parking
762 spaces
Land area
18,244 sq m
Timeline
Project startedFeb 2024
Proposed completionFeb 2029
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
370 of 370 available
BuildingTypeArea sq mAvailable
BASEMENT STOREStore10380 of 80
BLOCK-A FIFTH FLOORUnit No. 14-367923 of 23
BLOCK-A FIRST FLOORUnit No. 1-12 and 14-489247 of 47
BLOCK-A FOURTH FLOORUnit No. 14-3610123 of 23
BLOCK-A GROUND FLOOR WITH MEZZANINE FLOORUnit No. 1-12 and 14-4811247 of 47
BLOCK-A SECOND FLOORUnit No. 1-12 and 14-489247 of 47
BLOCK-A SIXTH FLOORUnit No. 14-367923 of 23
BLOCK-A THIRD FLOORUnit No. 1-12 and 14-489647 of 47
BLOCK-BUnit 49-814933 of 33
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
2,196 homes · 349 plotson the public record across 5 projects
1,90,891 sq mbuilt-up filed
37,556 sq mplotted area
2,01,106 sq mland declared
₹1574.58 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.0 kmPrimary road 564 mRailway line 3.9 kmRailway station 3.9km away (Mohali)Limited bus connectivity nearby
Water & environment
River 2.4 km
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Land, title & encumbrance
Land not fully owned18,244 of 18,244 sq m declared not yet owned by the promoter
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹295.52 Cr declared to build 370 flats. What that works out to:
₹79.87 Lakhdeclared cost per flatall-in — land + construction
₹8,012/sq ftof carpet area₹86,245/sq m
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Punjab registration department
In Punjab it’s called the collector rate.
No government guidance rate is shown for this project.
Punjab's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Punjab · Approved building plan
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Punjab · public record
Complaints register
Not published. RERA Punjab doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Cases on the builder's other projects
Declared by the builder
1 case
Number
Forum
GCNo 01612023
on Mohali Citi Centre 3
Chairman
What the builder declared
Declared to RERA Punjab
Litigation
None declared in this filing
Only what the builder declared, or what RERA Punjab records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Punjab, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
216 commercial projects still under way within 25 km. Step out ring by ring:
Of the 172 projects the radar draws within 6 km — every kind, every stage — 35 are commercial projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
170 m awayCommercial (Building/Tower Development)
Mohali Citi Centre- 2
KLG Jewellers (Other than Individual) · Sahibzada Ajit Singh Nagar
No government guidance rate could be matched to this project from Punjab's published schedules.
05Planning authority
RERA Punjab: the approved building plan, as filed.
06Complaints & litigation
Cases on the builder's other projects: declared by the builder in its RERA Punjab filing.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mohali-citi-centre-4-sahibzada-ajit-singh-4bxkrlli.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.