Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
81 units across 14 batches
TypeArea sq mCount
1 BHK2710
3 BHK971
3 BHK811
Shop1681
Shop1551
2 BHK5213
1 BHK3713
Shop981
Shop1111
Shop1141
3 BHK793
2 BHK6025
2 BHK662
3 BHK768
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Ahmedabad Municipal CorporationMunicipal / Corporation1 of 2 projects
Municipal Corporation of Greater MumbaiMunicipal Corporation1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 112m away · 2 clinics within 1km
LifestylePark 1.6km away · Gym or sports centre 1.7km away
ShoppingSupermarket 1.3km away · Bank 193m away
Getting around
Expressway 1.7 kmPrimary road 1.6 km · Padmabushan Vasantdada Patil MargRailway line 243 mRailway station 98m away (Bharat Petroleum)2 bus stops within 500m
Water & environment
Water body 297 m · Ashish Talao
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints register
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
4,204 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,637 projects the radar draws within 6 km — every kind, every stage — 529 are residential projects still under way. This list keeps only those, and looks further out.