01

Complete project overview

MahaRERA · Registration filing
Units
15 units
Floors
25
Buildings
2
Parking
15 spaces
Land area
327 sq m
Sanctioned built-up
355 sq m

Timeline

RERA registeredJan 2022
Proposed completionJul 2024
TodaySep 2026
Construction progress
Podiums0%
Flat fit-out0%
External finishes0%
OC-readiness0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Electrical meter r…0%
Internal finishes2%
Stairs & lifts27%
Superstructure30%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Mukesh Ramesh Bajaj And Manjit Singh Jodh Singh Abrol

IndividualPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400071
Survey no.
296 , 296/1 , 296/2
North boundary
11 metre road
East boundary
plot no - 118C
South boundary
18 metre wide road
West boundary
18 metre wide road
What’s nearby
SchoolsNearest school 1.6km away · College or university 1.5km away · Library 1.5km away
HealthcareHospital 324m away · 2 clinics within 1km
Lifestyle1 park within 500m · Gym or sports centre 528m away · 7 restaurants and cafes within 1km
ShoppingSupermarket 702m away · Bank 834m away · ATM within 500m
Getting around
Expressway 349 mPrimary road 785 m · Sewri-Chembur RoadRailway line 347 mMetro station 602m away (Chembur)Bus stop within 1km
Water & environment
Water body 476 m · Teen Talav
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. 296 , 296/1 , 296/2

The promised possession date (4 Jul 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,204 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,935 projects the radar draws within 6 km — every kind, every stage — 625 are residential projects still under way. This list keeps only those, and looks further out.

25 projects within 1 km — showing the nearest 6.

100 m awayResidential / Group Housing

HARI OM

MAJESTIC ROYALE DEVELOPERS · Chembur · Kurla

Jun 2024registered
Jun 2027target completion
Government Guidance Rate₹1,56,264/sq ydScale13 flatsAuthorityMahaRERA
210 m awayResidential / Group Housing

Gurukripa

Inspira Realty and Infra Private Limited · Kurla

Nov 2022registered
Sep 2026target completion
Scale163 flatsAuthorityMahaRERA
260 m awayOthers

Kedarnath

Neeshiv Properties · Chembur · Kurla

Feb 2025registered
Dec 2028target completion
Government Guidance Rate₹1,56,264/sq ydScale22 flatsAuthorityMahaRERA
280 m awayOthers

Sai Swaroop

SAI SHARAN HOTELS · Chembur · Kurla

Jun 2024registered
Dec 2027target completion
Government Guidance Rate₹1,56,264/sq ydScale219 flatsAuthorityMahaRERA
320 m awayMixed

ICONS 71

SKYPLUS REAL ESTATES PRIVATE LIMITED · Others · CTSO Chembur

Oct 2025registered
Dec 2031target completion
Scale60 flatsAuthorityMahaRERA
330 m awayOthers

KINGS PARADISE

Nilesh Laxmikant Kudalkar · Kurla

Jun 2019registered
Dec 2026target completion
2 open complaintsScale38 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.