The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Kurla
Taluka
Kurla
District
Mumbai Suburban
Pincode
400074
Survey no.
128
North boundary
CTS NO 124 129
East boundary
CTS NO 130
South boundary
CTS NO 130
West boundary
CTS NO 127
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 208m away · 2 clinics within 1km
LifestylePark 1.7km away · Gym or sports centre 1.9km away
ShoppingSupermarket 1.5km away · Bank 17m away
Getting around
Expressway 1.9 kmPrimary road 1.5 km · Padmabushan Vasantdada Patil MargRailway line 132 mRailway station 152m away (Bharat Petroleum)2 bus stops within 500m
Water & environment
Water body 450 m · Ashish Talao
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. 128
The promised possession date (30 Dec 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,191 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,639 projects the radar draws within 6 km — every kind, every stage — 534 are residential projects still under way. This list keeps only those, and looks further out.