NAVRANG NAVKAR

P51800047342 · MahaRERA · https://gethorizon.in/projects/navrang-navkar-borivali-7akoptvl

Registration lapsed

This project’s MahaRERA registration has lapsed— it expired and was not renewed. A lapsed project may be stalled, finished-but-not-updated, or abandoned; the record stops here and RERA’s ongoing protections may no longer apply. Confirm the current status directly with MahaRERA before you rely on anything below.

01

Complete project overview

MahaRERA · Registration filing
Units
80 units
Floors
24
Buildings
2
Parking
70 spaces
Land area
722 sq m
Sanctioned built-up
5,282 sq m

Timeline

RERA registeredOct 2022
Proposed completionOct 2025
TodaySep 2026
02

Builder’s track record

MahaRERA · Builder registration

OXFORD NAVRANG REALTY LLP

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Borivali
Taluka
Borivali
District
Mumbai Suburban
Pincode
400104
Survey no.
CTS NO 355(pt) 355/1 TO 9
North boundary
BUILDING NO 14
East boundary
S V ROAD
South boundary
30ft ROAD
West boundary
30ft ROAD
What’s nearby
Schools1 school within 500m · 4 educational institutions within 1km · College or university 1.7km away
HealthcareHospital 119m away · 10 clinics within 1km · Doctor's clinic within 1km
Lifestyle1 park within 500m · 8 restaurants and cafes within 1km
ShoppingSupermarket 590m away · Mall 43m away · Bank 313m away
Getting around
Expressway 1.2 kmPrimary road 44 m · Swami Vivekanand RoadRailway line 385 mRailway station 482m away (Goregaon)3 bus stops within 500m
Water & environment
River 698 m · Oshiwara RiverWater body 841 m
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Maharashtra Housing and Area Development Authority (MHADA)

Housing Authority
Building Permit
Survey no. CTS NO 355(pt) 355/1 TO 9

The promised possession date (31 Oct 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Maharashtra Housing and Area Development Authority (MHADA)

Planning authority

Has approved 438 RERA projects2.2% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
341
On record
13,458 flats · 0 plots
Reach
18 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,804 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,104 projects the radar draws within 6 km — every kind, every stage — 702 are residential projects still under way. This list keeps only those, and looks further out.

65 projects within 1 km — showing the nearest 6.

Pahadi-GoregaonMixed

Apricus

ARIHA MANSIONS LLP

Sep 2026registered
Aug 2029target completion
Government Guidance Rate₹1,35,001/sq ydScale61 flatsAuthorityMahaRERA
GoregaonResidential / Group Housing

AXIOM RUDRA

AXIOM REFAB CONSTRUCTION (INDIA) PVT LTD

Jul 2025registered
Mar 2030target completion
Scale138 flatsAuthorityMahaRERA
GoregaonResidential / Group Housing

Integrated Ramicon A

Integrated Affordable Home Private Limited

May 2024registered
Dec 2027target completion
Government Guidance Rate₹1,54,065/sq ydScale105 flatsAuthorityMahaRERA
Pahadi-GoregaonOthers

ASHWIN HEIGHTS

WESTINRELY DEVELOPERS PVT LTD

May 2024registered
Dec 2026target completion
Scale37 flatsAuthorityMahaRERA
Pahadi-GoregaonOthers

ARIHA VINCERE

VELSTAND REALTY LLP

Jul 2024registered
Jun 2027target completion
Government Guidance Rate₹1,34,466/sq ydScale95 flatsAuthorityMahaRERA
Pahadi-GoregaonOthers

Opulence

ARIHA BUILDTECH LLP

Oct 2024registered
Dec 2029target completion
Government Guidance Rate₹1,34,466/sq ydScale1,004 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.