The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Nahur
Taluka
Kurla
District
Mumbai Suburban
Pincode
400080
Survey no.
C.T.S. No. 667-C
North boundary
CTS No 658 and 659
East boundary
CTS No 661 - 1 Jawaharlal Nehru Road
South boundary
CTS No 667 and Mulund Goregaon Link Road - GMLR
West boundary
CTS No 667
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.8km away · Library 1.7km away
HealthcareHospital 330m away · 7 clinics within 1km · Pharmacy within 1km
LifestylePark 753m away · Gym or sports centre 668m away · 23+ restaurants and cafes within 1km
ShoppingSupermarket 75m away · Mall 1.0km away · Convenience store within 500m
Getting around
Expressway 1.4 kmPrimary road 29 m · Goregaon Mulund Link RoadRailway line 437 m · Central LineRailway station 770m away (Nahur)22 bus stops within 500m
Water & environment
Water body 702 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹1,31,088per sq yd
₹1,56,780per sq m
Which rate
residential flat (built)
Matched to
The rate published for the village of “Nahur”.
In force
2026-2027 schedule
Spread
₹43,872 – ₹1,48,446 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. C.T.S. No. 667-C
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
None on record with MahaRERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
Court cases, as declared
Declared by the builder
1 case
Number
Forum
Date
1348
Small Causes Court Dhobi Talao Mumbai
2021
What the builder declared
Declared to MahaRERA
Encumbrance
Declared financial encumbrance on the projectworth checking
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
4,989 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,350 projects the radar draws within 6 km — every kind, every stage — 512 are residential projects still under way. This list keeps only those, and looks further out.