Nature of project - Mixed land use. Reference uit kota letter dated 28.11.16, as of now the project has been approved as B1+B2+G+8.Further Approval updates being added on 06-12-2018.The following details have been submitted by developer after receiving further approval MAP'S from UIT Kota letter vide dated 05/10/2017.The details of Previousaly approved MAP's were:-B1+B2+G+08.Subsequentaly after further approval the details are as follows:-B1+B2+G+14 Floor.The same detials have been updated on RERA Portal on 06/12/2018.The detail revise comparative analysis which have been changes are enclosed here with under head of copy of layout approval "Others".Following details have been changed due to further approval as:1.)Open area:-364.09 Sqmt 2.)Height of the building 44.9 mt 3.)FAR 11227.42 sqmt4.)Builtup area:-19955.88 sqmt 5.)No of Apartment 207(Residential:-144+Shops 63).
All set of drawings inculding further approval can be viewed under copy of layout approval.To the best of our ability we have scan the MAPS.Update done on 20/12/2018,After Extension approval the Estimated Finish date for the said project is now 31.03.2018 and subsequentely in Form B Estimated finish date is updated.After extension approval Form B is also uploaded in addition.
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 1.5km away · Library 1.5km away
HealthcareHospital 314m away · 4 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.3km away
ShoppingSupermarket 1.4km away
Getting around
Expressway 2.5 km · Kota BypassPrimary road 2.2 kmRailway line 3.4 km · Mumbai - Delhi RailwayRailway station 3.6km away (Dakaniya Talav)Limited bus connectivity nearby
Water & environment
Canal 84 mWater body 1.2 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹65.01 Cr declared. What that works out to:
19%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 3 Oct 2017 · 8 yrs ago
The promised possession date (31 Mar 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
27 residential projects still under way within 25 km. Step out ring by ring:
Of the 54 projects the radar draws within 6 km — every kind, every stage — 12 are residential projects still under way. This list keeps only those, and looks further out.