10 on filequarterly progress reports filed with RERA
Timeline
RERA registeredMar 2022
Proposed completionJun 2025
TodaySep 2026
Construction progress
32% overall, as filed
Internal Roads And Footpaths0%
Water Supply0%
Sewerage0%
Storm Water Drains0%
Landscaping And Tree Planting0%
Street Lighting0%
Open Parking0%
Water Conservation Rain Water Harvesting0%
From the builder's latest quarterly progress report filed with RERA Chhattisgarh — % complete overall and per infrastructure work, as of that filing. A dated snapshot, not a live tracker.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
320 units across 2 batches
TypeArea sq mCount
1BHK34318
1BHK302
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
5,933 homeson the public record across 31 projects
₹17939.91 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools4 schools within 1km · 5 educational institutions within 1km · College or university 770m away
HealthcareHospital 1.5km away
Lifestyle1 park within 500m · Playground within 500m · Gym or sports centre 682m away
ShoppingNo supermarket within 2km
Getting around
Expressway 567 m · SIPAT ROADPrimary road 228 m · Behtarai RoadRailway line 4.4 kmRailway station 4.5km away (Bilaspur Junction)Limited bus connectivity nearby
Water & environment
Water body 218 m · Nagin Naag TalaabRiver 1.5 km · Arpa
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹14.83 Cr declared to build 321 flats. What that works out to:
₹4.62 Lakhdeclared cost per flatall-in — land + construction
0%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Chhattisgarh registration department
In Chhattisgarh it’s called the collector guideline rate.
No government guidance rate is shown for this project.
Chhattisgarh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
RERA Chhattisgarh · public record
Complaints, as the builder reports them
None in the builder’s latest quarterly return to RERA Chhattisgarh.
The builder’s own count of grievances it received — not RERA Chhattisgarh’s register, which isn’t published. Cases the builder declares are listed below.
What the builder declared
Declared to RERA Chhattisgarh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Chhattisgarh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Chhattisgarh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
83 residential projects still under way within 25 km. Step out ring by ring:
Of the 218 projects the radar draws within 6 km — every kind, every stage — 55 are residential projects still under way. This list keeps only those, and looks further out.