Plot No. 16,56-63 Total Area 1270.36 Sq. Mtr. are mortgage to Jaipur Development Authority. These Plots will be de-mortgaged
after the completion of internal development. We have not appointed any Consultant for our project till date. Open Area includes Land used in Park (1190.38 Sq. Mtr), Road (5287.57 Sq. Mtr) and Sector Road (1006.90 Sq. Mtr) Total 7484.85 Sq. Mtr. Mutation showing and mentioned in Khasra Naksha and Jamabandi(Copy) is considered and no other mutation issued by JDA for which declration has been attached in other approvals tab. All other declaration and affidavit are attached in other approvals tab.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Railway line 4.1 kmRailway station 4.2km away (Khatipura)Limited bus connectivity nearby
Water & environment
Water body 3.0 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹6.62 Cr declared. What that works out to:
₹352/sq ftof plotted area₹3,785/sq m
66%of the cost is land₹232/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Layout Permitapproved 5 Mar 2021 · 5 yrs ago
The promised possession date (31 Mar 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
191 plotted projects still under way within 25 km. Step out ring by ring:
Of the 221 projects the radar draws within 6 km — every kind, every stage — 17 are plotted projects still under way. This list keeps only those, and looks further out.
5 projects between 1 and 3 km — showing the nearest 5.