HORIZON
Share

RISHAB OM BRIJ KUTIR

P51800079288 · MahaRERA · https://gethorizon.in/projects/rishab-om-brij-kutir-pahadi-goregaon-borivali-wemeb2l7

01

Complete project overview

MahaRERA · Registration filing
Units
46 units
Floors
4
Buildings
2
Parking
19 spaces
Land area
588 sq m
Sanctioned built-up
601 sq m

Timeline

RERA registeredFeb 2025
Proposed completionDec 2027
TodaySep 2026
Construction progress
Basement (if any)0%
Podiums0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal finishes10%
Superstructure60%
Excavation100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

RISHAB INFRA

PartnershipPromoter type
Mumbai Suburban, MAHARASHTRABased in
5Projects
1City
2022–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
192 homeson the public record across 5 projects
6,139 sq mbuilt-up filed
3,933 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Municipal Corporation of Greater MumbaiMunicipal Corporationthis project2 of 4 projects
Slum Rehabilitation AuthoritySlum Rehabilitation Authority2 of 4 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from RISHAB INFRA— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Pahadi-Goregaon
Taluka
Borivali
District
Mumbai Suburban
Pincode
400097
Survey no.
12A/A/1A/1/1/A/6
North boundary
Kalpavriksh CHS
East boundary
Rishab Villa CHS
South boundary
Malad Shiv Krupa CHS
West boundary
Road
What’s nearby
Schools2 schools within 1km · College or university 1.4km away
HealthcareHospital 126m away · 10 clinics within 1km · Pharmacy within 1km
LifestylePark 617m away · Gym or sports centre 573m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 993m away · Mall 1.4km away · Bank 717m away
Getting around
Expressway 864 m · Pathanwadi FlyoverPrimary road 336 m · Swami Vivekanand RoadRailway line 167 m · Western Railway (Slow)Railway station 727m away (Malad)Limited bus connectivity nearby
Water & environment
River 1.0 kmWater body 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,12,877per sq yd
₹1,35,000per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Pahadi-Goregaon”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 12A/A/1A/1/1/A/6
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,869 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,209 projects the radar draws within 6 km — every kind, every stage — 755 are residential projects still under way. This list keeps only those, and looks further out.

46 projects within 1 km — showing the nearest 6.

MaladResidential / Group Housing

SHEETAL SHREE RAM KUNJ

D.G.S. LAND DEVELOPERS (INDIA) PVT. LTD.

Nov 2024registered
Dec 2029target completion
Scale81 flatsAuthorityMahaRERA
Pahadi-GoregaonResidential / Group Housing

KALPAVRIKSHA

ATHARVA RISE

Mar 2025registered
Jun 2027target completion
AuthorityMahaRERA
MaladOthers

RISHAB AANGAN

RISHAB INFRA

Mar 2025registered
Jun 2028target completion
Scale44 flatsAuthorityMahaRERA
MaladOthers

MEHTA HIGHLAND 1978

DEEP CONSTRUCTION CO

Jul 2024registered
Dec 2028target completion
Scale134 flatsAuthorityMahaRERA
Pahadi-GoregaonResidential / Group Housing

LAXMI MADHUVAN

LAXMI LEELA BUILDCON LLP

Jan 2025registered
May 2027target completion
Government Guidance Rate₹1,12,877/sq ydAuthorityMahaRERA
MaladResidential / Group Housing

NAVKETTAN PUSHPAANGAN

PRITI CONSTRUCTIONS PRIVATE LIMITED

Oct 2024registered
Mar 2028target completion
1 open complaintScale30 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.