ORBIT PRAVIN
PALLAVIT BUILDCON · Ahmedabad City
SANIDHYA 18
Timeline
85% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
₹7.08 Cr declared to build 14 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (30 Jun 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
All 1 block carry a Building-Use (BU) permission (latest 1 May 2024)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
Has approved 2,400 RERA projects — about 1 in 7 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
2 complaints
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | What | Date |
|---|---|---|
| — | Complaint | 7 Dec 2024 |
| SMC/NCQER/ONLINE/Ahmedabad/15052024/00169 | Non-compliance · quarterly report | 15 May 2024 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
2,648 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,226 projects the radar draws within 6 km — every kind, every stage — 419 are residential projects still under way. This list keeps only those, and looks further out.
24 projects within 1 km — showing the nearest 6.
PALLAVIT BUILDCON · Ahmedabad City
Triveni Palazzo LLP · Ahmedabad City
YAMAL HOMES LLP · Ahmedabad City
KRUPA INFINITY LLP · Ahmedabad City
DIPAKKUMARSOMALALSONI Proprietor of ZODIAC BUILDERS · Ahmedabad City
SHREE DEVELOPERS · Ahmedabad City
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you