Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.
Find your flat
Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
10 of 10 available
BuildingFloorTypeArea sq mAvailable
SANVI S BASIL13BHKmortgaged1451 of 1
SANVI S BASIL13BHK1431 of 1
SANVI S BASIL23BHK1451 of 1
SANVI S BASIL23BHK1431 of 1
SANVI S BASIL33BHK1451 of 1
SANVI S BASIL33BHK1431 of 1
SANVI S BASIL43BHK1451 of 1
SANVI S BASIL43BHK1431 of 1
SANVI S BASIL53BHK1451 of 1
SANVI S BASIL53BHK1431 of 1
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the builder that any specific flat is released before relying on clear title.
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
RERA Telangana · Registration filing
Locality
WEST MARREDPALLY
District
Hyderabad
Pincode
500026
North boundary
ROAD NO 2
East boundary
BY HOUSE ON PLOT NO 49
South boundary
BY HOUSE ON PLOT NO 21
West boundary
BY HOUSE ON PLOT NO 47
What’s nearby
Schools4 schools within 1km · 7 educational institutions within 1km · College or university 907m away
HealthcareHospital 104m away · Clinic within 2km · Pharmacy within 1km
Lifestyle1 park within 500m · Gym or sports centre 1.1km away · 9 restaurants and cafes within 1km
Expressway 1.9 km · Sardar Patel RoadPrimary road 415 m · St Johns RoadRailway line 1.3 kmMetro station 883m away (Parade Grounds (Green Line))Bus stop within 500m
Water & environment
Canal 685 m
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Location — done
04
Government Guidance Rate
Telangana registration department
In Telangana it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Hyderabad's rates are published on a separate system from the rest of Telangana, which hasn't been collected yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RERA Telangana · Approved building plan
Greater Hyderabad Municipal Corporation (GHMC)
Municipal / Corporation
Building Permit no. 2/18B/02772/2018Survey no. PLOT 43
The promised possession date (15 Feb 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 2/18B/02772/2018 on the approving authority’s portal to confirm the approval.
The approving body, at scale
GHMC
Municipal Corporation · Hyderabad city core
Has approved 3,102 RERA projects — about 1 in 4 in Telangana.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
1,994
On record
2,20,211 flats · 3,387 plots
Reach
65 mandals
Since
2016
More apartment-heavy than Telangana overall — 99% apartments here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Telangana doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Telangana
Litigation
None declared in this filing
Only what the builder declared, or what RERA Telangana records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Telangana, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
2,632 residential projects still under way within 25 km. Step out ring by ring:
Of the 335 projects the radar draws within 6 km — every kind, every stage — 140 are residential projects still under way. This list keeps only those, and looks further out.