Complete project overview

GujRERA · Registration filing
Units
27 units
Mix
27 × Mixed Development
Carpet area
8–93 sq mper-unit range, as filed
Parking
2 spaces
Land area
415 sq m

Timeline

Project startedJul 2022
RERA registeredDec 2022
Proposed completionDec 2026
TodayJul 2026
Construction progress

87% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your unit

Filed by type and size, in the batches the promoter registered — not a per-unit listing. Look yours up.

27 units across 1 batch
TypeArea sq mCount
Mixed Development3627

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Promoter registration

DAKSHAT DEVELOPERS

PARTNERSHIP FIRMPromoter type
Bhavnagar, GujaratBased in
1Projects
1City
2022–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Bhavnagar
District
Bhavnagar
Address
PLOT NO.COM.NO.29/17 AND 29/18, SURVEY NO.471/2,3,4
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.3km away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.6km away
Getting around
Expressway 1.4 kmPrimary road 1.8 km · Talaja RoadRailway line 4.2 kmRailway station 4.4km away (Bhavnagar Para)Limited bus connectivity nearby
Water & environment
Water body 2.1 km · Gaurishankar TalavRiver 2.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹2.28 Cr declared to build 27 flats. What that works out to:

₹3.57 Lakh – ₹39.42 Lakhdeclared unit pricerange on the filing — not a live asking price
₹8.43 Lakhdeclared cost per flatall-in — land + construction
₹2,151/sq ftof carpet area₹23,150/sq m
12%of the cost is land₹595/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

GujRERA · Approved building plan

Others

Building Permitapproved 2 Dec 2022 · 3 yrs ago
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

The approving authority

The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.