S J DEVELOPERS · Bhavnagar
SHIV SHAKTI RICH GOLD
Timeline
75% overall, as filed
Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.






₹1.68 Cr declared to build 33 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Open ground on the plot until 2019; a building is first visible in 2020 and is about 13 m tall by 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is the plot the promoter drew.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
No government guidance rate is shown for this project.
Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (29 Nov 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
All 1 block carry a Building-Use (BU) permission (latest 28 Apr 2023)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
Has approved 488 RERA projects — 2.8% of Gujarat.
an apartments market — 71% apartments · 29% plotted layouts. Apartments like yours are this body's core business.
More layout-heavy than Gujarat overall — 29% plots here vs 6% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
2 complaints
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
| Number | What | Date |
|---|---|---|
| SMC/NCAR/ONLINE/Bhavnagar/06022026/00081 | Non-compliance · annual report | 6 Feb 2026 |
| SMC/NCQER/ONLINE/Bhavnagar/17052024/00180 | Non-compliance · quarterly report | 17 May 2024 |
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
178 residential projects still under way within 25 km. Step out ring by ring:
Of the 693 projects the radar draws within 6 km — every kind, every stage — 178 are residential projects still under way. This list keeps only those, and looks further out.
12 projects within 1 km — showing the nearest 6.
S J DEVELOPERS · Bhavnagar
ARIHANT CONSTRUCTION · Bhavnagar
PUSHPARAJSINH KANAKSINH JADEJA · Bhavnagar
PUSHPARAJSINH KANAKSINH JADEJA · Bhavnagar
DAKSHAT DEVELOPERS · Bhavnagar
ANANT DEVELOPERS · Bhavnagar
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.
What this record cannot tell you
Where each section of this report comes from.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/shiv-shakti-rich-gold-bhavnagar-4vn7q8r2.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.