The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
District
Mumbai City
Pincode
400037
Survey no.
CS 184 part, CS 192 part
North boundary
Antop Hill warehousing
East boundary
Antophill WH Bhaiyasaab Nagar
South boundary
Sewri Chembur Road
West boundary
Vidyalankar College Road
What’s nearby
SchoolsNearest school 1.1km away · College or university 954m away · Library 763m away
HealthcareHospital 551m away · 5 clinics within 1km
Expressway 1.4 km · Dr Babasaheb Ambedkar Marg (Vincent Road)Primary road 418 mRailway line 257 mRailway station 428m away (Wadala Bridge)Bus stop within 1km
Water & environment
Water body 843 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Slum Rehabilitation Authority
Slum Rehabilitation Authority
Building Permit
Survey no. CS 184 part, CS 192 part
The promised possession date (28 Feb 2020) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Slum Rehabilitation Authority
Planning authority
Has approved 729 RERA projects — 3.6% of Maharashtra.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000292258
23 Sep 2025
Court cases, as declared
Declared by the builder
2 cases · 0 disposed · 2 open
Number
Forum
Date
Status
26628
High Court · Single bench · Mumbai
2022
Ongoingopen
26635
High Court · Single bench · Mumbai
2022
Ongoingopen
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
3,485 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,369 projects the radar draws within 6 km — every kind, every stage — 462 are residential projects still under way. This list keeps only those, and looks further out.