Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
16 units across 5 batches
TypeArea sq mCount
2 BHK625
2 BHK704
Mproom233
Mp Room173
Mp Room201
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Mumbai City
Taluka
Mumbai City
District
Mumbai City
Pincode
400019
Survey no.
277/10 OF MATUNGA DIVISION
North boundary
Telang Cross Road No1
East boundary
278-10
South boundary
270-10
West boundary
276-10
What’s nearby
Schools1 school within 500m · 10 educational institutions within 1km · College or university 985m away
HealthcareHospital 138m away · 14 clinics within 1km · Pharmacy within 500m
Lifestyle1 park within 500m · Gym or sports centre 1.3km away · 36+ restaurants and cafes within 1km
ShoppingSupermarket 456m away · Mall 924m away · Convenience store within 500m
Getting around
Expressway 147 m · King's Circle FlyoverPrimary road 497 m · Rafi Ahmed Kidwai MargRailway line 345 mRailway station 339m away (Matunga)10 bus stops within 500m
Water & environment
Water body 1.6 km · tank
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra IGR — Annual Statement of Rates
In Maharashtra it’s called the ready reckoner rate.
₹2,03,722per sq yd
₹2,43,650per sq m
Which rate
residential flat (built)
Matched to
The rate published for “MATUNGA”.
In force
2026-2027 schedule
What this number is — and isn’t
The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12503852
3 Nov 2025
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,535 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,727 projects the radar draws within 6 km — every kind, every stage — 582 are residential projects still under way. This list keeps only those, and looks further out.