Detailed Report

New National Market Annexe

P51900029270 · MahaRERA · https://gethorizon.in/projects/new-national-market-annexe-dadar-naigaon-division-mumbai-city-b3xbf2wz

01

Complete project overview

MahaRERA · Registration filing
Units
135 units
Floors
5
Buildings
2
Parking
16 spaces
Land area
948 sq m
Sanctioned built-up
559 sq m

Timeline

RERA registeredMay 2021
Proposed completionSep 2022
TodaySep 2026
Construction progress
Podiums0%
Open Parking0%
Flat fit-out80%
OC-readiness85%
External finishes90%
Fire protection an…90%
Excavation100%
Basement (if any)100%
Plinth100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Stairs & lifts100%
Internal Roads & F…100%
Water Supply100%
Sewerage (Chamber,…100%
Storm Water Drains100%
Landscaping & Tree…100%
Street Lighting100%
Solid Waste Manage…100%
Water conservation…100%
Electrical meter r…100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

Suleman Haroon & Company

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1Cities
2021–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
The Horizon Radar(within 6 km)
2km4km6kmN
  • This project
  • 162 new projects last year
  • 1,315 nearby projects
1 km radius · coordinates as filed · 19.0158, 72.8573 · © OpenStreetMap contributors
District
Mumbai City
Pincode
400031
Survey no.
CS No- 245pt,335pt, and 374pt for slum plot and 245 pt ,366pt and 370pt for Non Slum plot
North boundary
Dadar Naigaon Road
East boundary
Ambedkar Ground
South boundary
Municipal Colony
West boundary
Kidwai Marg
What’s nearby
Schools1 school within 1km · 4 educational institutions within 1km · College or university 461m away
HealthcareHospital 480m away · 7 clinics within 1km · Pharmacy within 1km
LifestylePark 718m away · Gym or sports centre 1.7km away · 3 restaurants and cafes within 1km
ShoppingSupermarket 1.5km away · Mall 1.8km away · Convenience store within 1km
Getting around
Expressway 942 m · Dr Babasaheb Ambedkar Marg (Vincent Road)Primary road 184 m · Rafi Ahmed Kidwai MargRailway line 113 m · Central Railway (Harbour Line)Railway station 282m away (Wadala Bridge)2 bus stops within 500m
Water & environment
Water body 1.2 km
distances only — not a flood assessment
04

Satellite view of the site

Google Open Buildings, 2016–2023 · Sentinel-2 imagery

No building detected within ~20 m of the recorded location in any year from 2016 to 2023.

Satellite view, year by year

loading 2023

Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.

Satellite photographs of the same ground

Mar 2017
Feb 2023
Mar 2026

Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.

How to read this

  • No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
  • This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
  • Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.

Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026

05

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

06

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. CS No- 245pt,335pt, and 374pt for slum plot and 245 pt ,366pt and 370pt for Non Slum plot

The promised possession date (30 Sep 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

08

Other projects nearby

The register · within 25 km

215 commercial projects still under way within 25 km. Step out ring by ring:

Of the 1,315 projects the radar draws within 6 km — every kind, every stage — 18 are commercial projects still under way. This list keeps only those, and looks further out.

1 project between 1 and 3 km — showing the nearest 1.

2.9 km awayCommercial

Lodha Signet Lower Parel Wing B

MACROTECH DEVELOPERS LIMITED · Worli

Jun 2022registered
Aug 2026target completion
Scale145 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with MahaRERA, as the builder submitted it.
  2. 02Builder's track record
    • MahaRERA: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location
    • Address and pincode: the MahaRERA filing.
    • Coordinates: as filed with MahaRERA.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Satellite view of the site
    • Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
    • Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
  5. 05Government Guidance Rate
    • No government guidance rate could be matched to this project from Maharashtra's published schedules.
  6. 06Planning authority
    • MahaRERA: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  7. 07Complaints & litigation
    • MahaRERA's public record lists no complaints or litigation for this project.
  8. 08Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/new-national-market-annexe-dadar-naigaon-division-mumbai-city-b3xbf2wz.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.