Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
80 units across 1 batch
TypeArea sq mCount
Commercial and Residential5580
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
GujRERA · Registration filing
Taluka
Rajkot
District
Rajkot
Pincode
360004
Address
Mavdi - Pal RoadOpp. Sankar City
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 562m away · 1 clinic within 1km
Lifestyle1 park within 500m
ShoppingNo supermarket within 2km · Mall 854m away
Getting around
Expressway 796 mPrimary road 3.2 km · Rajkot RoadRailway line 2.2 km · Rajkot–SomnathRailway station 3.3km away (Bhaktinagar)2 bus stops within 500m
Water & environment
Water body 3.3 km · Water TankRiver 3.6 km
distances only — not a flood assessment
Land, title & encumbrance
MortgageLoan outstanding · ₹7.48 Cr outstanding
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price
₹12.26 Cr declared to build 80 flats. What that works out to:
₹14.00 Lakh – ₹60.06 Lakhdeclared unit pricerange on the filing — not a live asking price
₹15.32 Lakhdeclared cost per flatall-in — land + construction
9%of the cost is land₹530/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Gujarat Revenue Department — Annual Statement of Rates (jantri), 2011
In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.
₹9,615per sq yd
₹11,500per sq m
Which rate
land + construction: residential flat
Matched to
The rate published for the village of “MAVDI-1”.
In force
2011 schedule
What this number is — and isn’t
The minimum value Gujarat’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
GujRERA · Approved building plan
Rajkot Municipal Corporation
Municipal / Corporation
Building Permitapproved 2 Jun 2018 · 8 yrs ago
The promised possession date (30 Jun 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Building-Use (BU) permission — the occupancy sign-off, on record
All 2 blocks carry a Building-Use (BU) permission (latest 5 Jan 2022)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.
The approving body, at scale
Rajkot Municipal Corporation
Municipal Corporation
Has approved 1,120 RERA projects — about 1 in 15 in Gujarat.
an apartments market — 99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.
Builders
910
On record
83,645 flats · 1,612 plots
Reach
2 talukas
Since
2011
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
GujRERA's list gives each complaint's number and date, not its status or outcome — and only disputes escalated to GujRERA appear here at all.
Number
What
Date
CMP/B/ONLINE/Rajkot/18042023/00194
Complaint · Form B
11 Apr 2023
NCQR-253/2019
Non-compliance · quarterly report
13 Feb 2019
What the builder declared
Declared to GujRERA
Litigation
None declared in this filing
Only what the builder declared, or what GujRERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with GujRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
411 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,312 projects the radar draws within 6 km — every kind, every stage — 260 are residential projects still under way. This list keeps only those, and looks further out.