Complete project overview

K-RERA · Registration filing
Units
53 units
Mix
11 × TYPE A · 11 × TYPE B · 10 × TYPE D · 10 × TYPE C · 5 × TYPE E · 5 × TYPE F
Booked
50 of 53 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
2,352 sq m
Floor area
11,954 sq m
Description
SKYLINE OPUS

Timeline

Project startedDec 2017
RERA registeredApr 2021
Proposed completionJul 2022
TodayJul 2026
Construction progress

88% overall, as filed

Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Excavation100%
Basement(s) and Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings100%
Sanitary Fittings100%
Electrical Fittings100%
Staircases, Lifts Wells100%
Overhead and Underground Water Tanks.100%
The external plumbing and external plastering100%
Completion of terraces floor each building100%
Installation of lifts, water pumps etc100%
Fire Fighting Fittings and Equipment100%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc100%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your unit

Filed by type and size, in the batches the promoter registered — not a per-unit listing. Look yours up.

3 of 53 available
TypeArea sq mAvailable
TYPE E1360 of 5
TYPE F1250 of 5
TYPE D1070 of 10
TYPE A1361 of 11
TYPE B1181 of 11
TYPE 1C1161 of 1
TYPE C1160 of 10

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

M/s Skyline Builders

PartnershipPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
30Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,397 homes · 125 plotson the public record across 30 projects
2,87,146 sq mbuilt-up filed
95,889 sq mplotted area
1,58,410 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Cochin Municipal CorporationMunicipal Corporationthis project6 of 30 projects
Kozhikode Municipal CorporationMunicipal Corporation4 of 30 projects
Thrikkakara MunicipalityMunicipality4 of 30 projects
CorporationLocal body (LSGI)2 of 30 projects
Mangalapuram Grama PanchayatGrama Panchayat2 of 30 projects
MunicipalityLocal body (LSGI)2 of 30 projects
Thrissur Municipal CorporationMunicipal Corporation2 of 30 projects
Alanagd Grama PanchayatGrama Panchayat1 of 30 projects
Eloor MunicipalityMunicipality1 of 30 projects
Kannur Municipal CorporationMunicipal Corporation1 of 30 projects
Kottayam MunicipalityMunicipality1 of 30 projects
Municipal Corporation Of CochinLocal body (LSGI)1 of 30 projects
Tripunithura MunicipalityMunicipality1 of 30 projects
Viajayapuram Grama PanchayatGrama Panchayat1 of 30 projects
Vijayapuram Grama PanchayatGrama Panchayat1 of 30 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
PALARIVATTOM
Village
EDAPPALLY SOUTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682025
Survey no.
167/4A
Patta no.
35440
What’s nearby
Schools3 schools within 1km · 4 educational institutions within 1km · College or university 254m away
HealthcareHospital 807m away · 3 clinics within 1km · Pharmacy within 500m
LifestylePark 2.0km away · Gym or sports centre 1.9km away · 24+ restaurants and cafes within 1km
ShoppingSupermarket 381m away · Mall 1.6km away · Bank 345m away
Getting around
Expressway 370 m · Salem - Kochi - Kanyakumari RoadPrimary road 304 m · Civil Line RoadRailway line 2.3 kmMetro station 789m away (Palarivattom)7 bus stops within 500m
Water & environment
Canal 1.2 kmWater body 1.7 km
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Cochin Municipal Corporation

Municipal Corporation
approved 19 Jan 2016 · 10 yrs ago
Building Permit no. EYP2/COC/EYP/1515/15Survey no. 167/4A

The promised possession date (30 Jul 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan EYP2/COC/EYP/1515/15 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

Cochin Municipal Corporation

Municipal corporation / municipality

Has approved 40 RERA projects2.6% of Kerala.

an apartments market98% apartments · 2% plotted layouts. Apartments like yours are this body's core business.

Builders
24
On record
1,429 flats · 19 plots
Since
2021

More apartment-heavy than Kerala overall — 98% apartments here vs 81% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.