Complete project overview

K-RERA · Registration filing
Units
36 units
Mix
11 × TYPE B · 11 × TYPE A · 11 × TYPE C · 1 × TYPE 1 A · 1 × TYPE 1 B · 1 × TYPE 1 C
Booked
34 of 36 filed sold/bookedas declared in the RERA filing
Buildings
1
Land area
1,783 sq m
Floor area
8,521 sq m
Description
SKYLINE ZEST

Timeline

RERA registeredDec 2023
Project startedJan 2024
Proposed completionDec 2028
TodayJul 2026
Construction progress

2% overall, as filed

Excavation0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Internal Plastering, Floorings inside the building, Doors and Windows to each Buildings0%
Sanitary Fittings0%
Electrical Fittings0%
Staircases, Lifts Wells0%
Overhead and Underground Water Tanks.0%
The external plumbing and external plastering0%
Completion of terraces floor each building0%
Installation of lifts, water pumps etc0%
Fire Fighting Fittings and Equipment0%
Common Areas work for each building like electrical fittings and other finishing works such as paving of common area etc0%
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0%
Overall Percentage of Completion of the work done For the entire Building /Wing0%
Basement(s) and Plinth24%
Per-activity completion % from the promoter's construction-task checklist filed with K-RERA — overall is the average across activities, as of that filing. A dated snapshot, not a live tracker.

Find your unit

Filed by type and size, in the batches the promoter registered — not a per-unit listing. Look yours up.

2 of 36 available
TypeArea sq mAvailable
TYPE B1130 of 11
TYPE A1090 of 11
TYPE C1502 of 11
TYPE 1 A1090 of 1
TYPE 1 B1130 of 1
TYPE 1 C1500 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

K-RERA · Promoter registration

M/s Skyline Builders

PartnershipPromoter type
Ernakulam, KeralaBased in
Yes — the promoter declared prior project experienceDeclared prior experience
30Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
1,397 homes · 125 plotson the public record across 30 projects
2,87,146 sq mbuilt-up filed
95,889 sq mplotted area
1,58,410 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Planning authoritiesthis builder's portfolio, by approving body
Cochin Municipal CorporationMunicipal Corporation6 of 30 projects
Kozhikode Municipal CorporationMunicipal Corporation4 of 30 projects
Thrikkakara MunicipalityMunicipality4 of 30 projects
CorporationLocal body (LSGI)2 of 30 projects
Mangalapuram Grama PanchayatGrama Panchayat2 of 30 projects
MunicipalityLocal body (LSGI)2 of 30 projects
Thrissur Municipal CorporationMunicipal Corporation2 of 30 projects
Alanagd Grama PanchayatGrama Panchayat1 of 30 projects
Eloor MunicipalityMunicipality1 of 30 projects
Kannur Municipal CorporationMunicipal Corporation1 of 30 projects
Kottayam MunicipalityMunicipality1 of 30 projects
Municipal Corporation Of CochinLocal body (LSGI)this project1 of 30 projects
Tripunithura MunicipalityMunicipality1 of 30 projects
Viajayapuram Grama PanchayatGrama Panchayat1 of 30 projects
Vijayapuram Grama PanchayatGrama Panchayat1 of 30 projects

Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

K-RERA · Registration filing
Street
Elamakkara
Village
EDAPPALLY SOUTH
Taluk
Kanayannur
District
Ernakulam
Pincode
682026
Survey no.
197/7-3, 197/7-3-2, 197/7-2-2, 197/7-3-2-2
Patta no.
52077
What’s nearby
Schools2 schools within 1km · College or university 1.2km away · Library 1.6km away
HealthcareHospital 222m away · 3 clinics within 1km · Pharmacy within 1km
LifestylePark 829m away · Gym or sports centre 904m away · 6 restaurants and cafes within 1km
ShoppingSupermarket 620m away · Mall 2.0km away · Convenience store within 1km
Getting around
Expressway 2.1 kmPrimary road 1.2 km · Old NH 47Railway line 1.1 kmMetro station 1.2km away (Changampuzha Park)4 bus stops within 500m
Water & environment
Water body 445 m · Punnackal Temple PondCanal 451 m
distances only — not a flood assessment
Land, title & encumbrance
Land ownershipBuilt on land that includes third-party owners — a landowner (joint-development) arrangement is declared; confirm the title and your share
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
04

Planning authority

K-RERA · Approved building plan

Municipal Corporation Of Cochin

Local body (LSGI)
approved 4 Dec 2023 · 2 yrs ago
Building Permit no. EYP2/22/6568/2023Survey no. 197/7-3, 197/7-3-2, 197/7-2-2, 197/7-3-2-2
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan EYP2/22/6568/2023 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

The local self-government (LSGI)

The local body that sanctioned this project. It has approved 404 RERA projects across 14 districts about 1 in 4 in Kerala.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — K-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — K-RERA does not publish a complaints register. This read cannot speak to them either way.