SKYLINE ZORA
M/s Skyline Builders
SKYLINE MATRIX
Timeline
10% overall, as filed
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the builder declared — not a live booking system.
These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
In Kerala it’s called the fair value.
What this number is — and isn’t
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan TP1-B1-103/2023 on the approving authority’s portal to confirm the approval.
Has approved 60 RERA projects — 3.9% of Kerala.
an apartments market — 92% apartments · 8% plotted layouts. Apartments like yours are this body's core business.
More apartment-heavy than Kerala overall — 92% apartments here vs 81% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. K-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
3 cases · 0 disposed · 2 open · 1 with no clear status
| Number | What | Forum | Date | Status |
|---|---|---|---|---|
| 126/2023 | Complaint | K-RERA Authority | 2023 | not stated |
| 968 | Suit | Munsiff Court Ernakulam | 2021 | Case filed by Lewis is pending Six cents in plaint A schedule is not part of project Matrix |
| 275 | Suit | Munsiff Court Ernakulam | 2019 | Case is pending Filed by Skyline Builders for recovery of posesion of ten cents not part of Matrix |
The builder's own declaration at registration — not a court's or K-RERA's finding. A flagged line is worth checking with K-RERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with K-RERA, or that this register doesn’t publish it — never that nothing happened.
188 residential projects still under way within 25 km. Step out ring by ring:
Of the 215 projects the radar draws within 6 km — every kind, every stage — 87 are residential projects still under way. This list keeps only those, and looks further out.
3 projects within 1 km — showing the nearest 3.
M/s Skyline Builders
ACCORD HABITAT PRIVATE LIMITED
CASADEL BUILDERS INDIA PRIVATE LIMITED
Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.
What this record cannot tell you