TBC Marol Phase 1

P51800080380 · MahaRERA · https://gethorizon.in/projects/tbc-marol-phase-1-marol-andheri-m3ussa4s

01

Complete project overview

MahaRERA · Registration filing
Project name
TBC Marol Phase 1
Units
218 units
Floors
25
Buildings
4
Parking
2 spaces
Land area
3,252 sq m
Sanctioned built-up
23,515 sq m
Recreational open space
85 sq m

Timeline

RERA registeredMay 2025
Proposed completionDec 2030
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Podiums0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

AGATE REALTORS AND DEVELOPERS

PartnershipPromoter type
Mumbai City, MAHARASHTRABased in
2Projects
1City
2025–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
354 homeson the public record across 2 projects
39,313 sq mbuilt-up filed
20,957 sq mland declared

These are sums of what the builder has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from AGATE REALTORS AND DEVELOPERS— the full portfolio →

03

Location

MahaRERA · Registration filing
Village
Marol
Taluka
Andheri
District
Mumbai Suburban
Pincode
400059
Survey no.
395(Pt), 396B(pt), 396C(pt) ,396D, 397(pt), 398, 398/1,407, 408, 408/1 to 3, 409, 409/1, 410, 412(pt), 413, 413/1 to 18, 414(Pt), 420(Pt), 433, 433/1 & 432(pt.)
North boundary
13-40 mtr Wide DP Road
East boundary
Sports Complex Reservation
South boundary
Layout RG
West boundary
6 Mtr Driveway
What’s nearby
SchoolsNearest school 1.5km away · College or university 1.6km away
HealthcareHospital 288m away · 3 clinics within 1km
LifestylePark 1.5km away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 625m away · Convenience store within 500m · Bank 834m away
Getting around
Expressway 2.8 kmPrimary road 753 m · Mathuradas Vasanji Road (Andheri Kurla Road)Railway line 3.6 kmMetro station 760m away (Marol Naka (Line 3))Bus stop within 500m
Water & environment
River 581 m · Mithi River
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra IGR — Annual Statement of Rates

In Maharashtra it’s called the ready reckoner rate.

₹1,45,770per sq yd
₹1,74,340per sq m
Which rate
residential flat (built)
Matched to
The rate published for “Marol”.
In force
2026-2027 schedule

What this number is — and isn’t

  • The minimum value Maharashtra’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

MahaRERA · Approved building plan

Slum Rehabilitation Authority

Slum Rehabilitation Authority
Building Permit
Survey no. 395(Pt), 396B(pt), 396C(pt) ,396D, 397(pt), 398, 398/1,407, 408, 408/1 to 3, 409, 409/1, 410, 412(pt), 413, 413/1 to 18, 414(Pt), 420(Pt), 433, 433/1 & 432(pt.)
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Slum Rehabilitation Authority

Planning authority

Has approved 729 RERA projects3.6% of Maharashtra.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
554
On record
15,389 flats · 0 plots
Reach
4 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

4,245 residential projects still under way within 25 km. Step out ring by ring:

Of the 2,546 projects the radar draws within 6 km — every kind, every stage — 849 are residential projects still under way. This list keeps only those, and looks further out.

12 projects within 1 km — showing the nearest 6.

80 m awayResidential / Group Housing

TBC Marol Phase 2

AGATE REALTORS AND DEVELOPERS · Marol · Andheri

Mar 2026registered
Dec 2031target completion
Government Guidance Rate₹1,45,770/sq ydScale136 flatsAuthorityMahaRERA
290 m awayResidential / Group Housing

VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B

NEEPA REAL ESTATES PRIVATE LIMITED · Andheri

Dec 2021registered
Dec 2026target completion
Scale349 flatsAuthorityMahaRERA
580 m awayOthers

Stellar Heights

STARWING DEVELOPERS PRIVATE LIMITED · Marol · Andheri

Feb 2023registered
Jun 2026target completion
Government Guidance Rate₹1,45,770/sq ydScale13 flatsAuthorityMahaRERA
650 m awayResidential / Group Housing

LA GRACE

Ecohomes Ventures · Marol · Andheri

Apr 2023registered
Dec 2026target completion
Government Guidance Rate₹1,45,770/sq ydAuthorityMahaRERA
770 m awayOthers

RADIANT 59

VEER JALARAM DEVELOPERS · Andheri

Sep 2021registered
Dec 2026target completion
Scale186 flatsAuthorityMahaRERA
790 m awayResidential / Group Housing

VKG ESTATES

Greenery Rock LLP · Andheri

Jul 2017registered
Dec 2026target completion
8 open complaintsScale204 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.