The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
Village
Andheri
Taluka
Andheri
District
Mumbai Suburban
Pincode
400059
Survey no.
CTS No. 189 B
North boundary
6 point 71 Mt Internal Layout Road
East boundary
13 point 40 Mt Wide DP Road
South boundary
CTS No 189 A
West boundary
Layout RG
What’s nearby
Schools2 schools within 1km · College or university 1.9km away
HealthcareHospital 321m away · 4 clinics within 1km
LifestylePark 1.2km away · 26+ restaurants and cafes within 1km
ShoppingSupermarket 234m away · Bank 787m away
Getting around
Expressway 2.3 km · Andheri FlyoverPrimary road 138 m · Mathuradas Vasanji Road (Andheri Kurla Road)Railway line 3.0 kmMetro station 417m away (Marol Naka (Line 3))2 bus stops within 500m
Water & environment
Water body 802 mRiver 1.0 km · Mithi River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
MahaRERA · Approved building plan
Bom/(W Ke) Hsg (T C) 4037/88 89
Building Permit
Survey no. CTS No. 189 B
The promised possession date (31 Jan 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
The planning authority
The body that approved this project. It has approved 4,607 RERA projects across 33 districts — about 1 in 4 in Maharashtra.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
1 complaint · 1 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC006000000209362
10 Dec 2021
Order Approveddisposed
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
248 commercial projects still under way within 25 km. Step out ring by ring:
Of the 2,605 projects the radar draws within 6 km — every kind, every stage — 60 are commercial projects still under way. This list keeps only those, and looks further out.