HORIZON
Share

TwentyFive South -Tower C

P51900030729 · MahaRERA · https://gethorizon.in/projects/twentyfive-south-tower-c-prabhadevi-mumbai-city-v5x1fg2m

01

Complete project overview

MahaRERA · Registration filing
Project name
TwentyFive South -Tower C
Units
29 units
Floors
59
Buildings
2
Parking
1 spaces
Land area
594 sq m
Sanctioned built-up
182 sq m
Recreational open space
6,010 sq m

Timeline

RERA registeredSep 2021
Proposed completionDec 2030
TodaySep 2026
Construction progress
Internal Roads & F…0%
Water Supply0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Energy managemcnt0%
Electrical meter r…0%
Aggregate area of …0%
Flat fit-out20%
External finishes20%
Fire protection an…30%
Internal finishes47%
Stairs & lifts50%
Solid Waste Manage…50%
Water conservation…50%
Superstructure80%
Sewerage (Chamber,…80%
Storm Water Drains80%
OC-readiness95%
Excavation100%
Basement (if any)100%
Podiums100%
Plinth100%
Stilt floor100%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

TWENTY FIVE SOUTH REALITY LIMITED

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1Cities
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
District
Mumbai City
Pincode
400025
Survey no.
F.P.No 1211 of TPS-IV, Mahim in G/North ward
North boundary
Adjoining F P No 1215
East boundary
Adjoining North Tower
South boundary
Adjoining F P No 1217
West boundary
Adjoining South Tower
What’s nearby
Schools2 schools within 1km · 7 educational institutions within 1km · College or university 218m away
HealthcareHospital 401m away · 4 clinics within 1km · Pharmacy within 1km
LifestylePark 1.0km away · Gym or sports centre 559m away · 18+ restaurants and cafes within 1km
ShoppingSupermarket 90m away · Mall 303m away · Bank 732m away
Getting around
Expressway 1.6 km · Dadasaheb Phalke MargPrimary road 159 m · Raobahadur S.K. Bole MargRailway line 1.2 km · Mumbai - Delhi RailwayMetro station 360m away (Siddhivinayak Temple)4 bus stops within 500m
Water & environment
Water body 1.0 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation
Building Permit
Survey no. F.P.No 1211 of TPS-IV, Mahim in G/North ward
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,089 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,279 projects the radar draws within 6 km — every kind, every stage — 471 are residential projects still under way. This list keeps only those, and looks further out.

30 projects within 1 km — showing the nearest 6.

Mumbai CityResidential / Group Housing

25 South Tower A upto 10th Floor

Twenty Five South Realty Limited

Aug 2017registered
Dec 2026target completion
Scale36 flatsAuthorityMahaRERA
Mumbai CityResidential / Group Housing

25 South Tower A 11th to 47th Floor

Twenty Five South Realty Limited

Aug 2017registered
Dec 2026target completion
1 open complaintScale113 flatsAuthorityMahaRERA
GNorth-400028Residential / Group Housing

Janai Heritage

S N Bandekar & Associates

Mar 2026registered
Sep 2029target completion
Scale99 flatsAuthorityMahaRERA
OthersResidential / Group Housing

NAIA

PRABHADEVI DEVELOPER PRIVATE LIMITED

Aug 2026registered
Dec 2030target completion
Scale15 flatsAuthorityMahaRERA
Mumbai CityResidential / Group Housing

1515 Moneco

LLOYDS REALTY DEVELOPERS LIMITED

Oct 2021registered
Sep 2026target completion
Scale29 flatsAuthorityMahaRERA
Mumbai CityResidential / Group Housing

Sugee Sukrut

Sugee Nine Developers LLP

Jun 2023registered
Oct 2026target completion
Scale24 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.