HORIZON
Share

NAIA

PR1170002601427 · MahaRERA · https://gethorizon.in/projects/naia-others-ward-gsouth-s2dvzrtf

01

Complete project overview

MahaRERA · Registration filing
Project name
NAIA
Units
15 units
Floors
21
Buildings
2
Parking
59 spaces
Land area
1,937 sq m
Sanctioned built-up
10,460 sq m
Recreational open space
291 sq m

Timeline

RERA registeredAug 2026
Proposed completionDec 2030
TodaySep 2026
Construction progress
Excavation0%
Basement (if any)0%
Plinth0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Internal Roads & F…0%
Water Supply0%
Sewerage (Chamber,…0%
Storm Water Drains0%
Landscaping & Tree…0%
Street Lighting0%
Treatment And Disp…0%
Solid Waste Manage…0%
Water conservation…0%
Fire protection an…0%
Electrical meter r…0%
Aggregate area of …0%
Per-activity completion % as filed with MahaRERA, shown for in-progress projects — a snapshot, not a live tracker.
02

Builder’s track record

MahaRERA · Builder registration

PRABHADEVI DEVELOPER PRIVATE LIMITED

CompanyPromoter type
Mumbai City, MAHARASHTRABased in
1Projects
1City
2026–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

MahaRERA · Registration filing
Village
Others
Taluka
Ward GSouth
District
Mumbai City
Pincode
400025
Survey no.
1214
North boundary
Plot No. 1213 - Maimoon Apartments
East boundary
Palkhy Gulley
South boundary
F. P. No. 1216 - Twin Towers
West boundary
Bay of Mahim
What’s nearby
Schools2 schools within 1km · 8 educational institutions within 1km · College or university 452m away
HealthcareHospital 437m away · 2 clinics within 1km · Pharmacy within 1km
LifestylePark 1.2km away · Gym or sports centre 583m away · 11+ restaurants and cafes within 1km
ShoppingSupermarket 317m away · Mall 540m away · Bank 967m away
Getting around
Expressway 1.8 km · Dadasaheb Phalke MargPrimary road 321 m · Swatantrya Veer Savarkar MargRailway line 1.4 km · Mumbai - Delhi RailwayMetro station 488m away (Siddhivinayak Temple)4 bus stops within 500m
Water & environment
Water body 1.1 km
distances only — not a flood assessment
04

Government Guidance Rate

Maharashtra registration department

In Maharashtra it’s called the ready reckoner rate.

No government guidance rate is shown for this project.

Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

MahaRERA · Approved building plan

Municipal Corporation of Greater Mumbai

Municipal Corporation · MCGM
Building Permit
Survey no. 1214
The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Municipal Corporation of Greater Mumbai

Municipal corporation

Has approved 2,862 RERA projectsabout 1 in 7 in Maharashtra, more than any other body in the state.

an apartments market100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.

Builders
2,166
On record
34,498 flats · 0 plots
Reach
9 districts
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by MahaRERA

07

Other projects nearby

The register · within 25 km

3,079 residential projects still under way within 25 km. Step out ring by ring:

Of the 1,266 projects the radar draws within 6 km — every kind, every stage — 468 are residential projects still under way. This list keeps only those, and looks further out.

23 projects within 1 km — showing the nearest 6.

240 m awayResidential / Group Housing

TwentyFive South -Tower C

TWENTY FIVE SOUTH REALITY LIMITED · Prabhadevi

Sep 2021registered
Dec 2030target completion
Scale29 flatsAuthorityMahaRERA
260 m awayResidential / Group Housing

25 South Tower A upto 10th Floor

Twenty Five South Realty Limited · Mumbai City

Aug 2017registered
Dec 2026target completion
Scale36 flatsAuthorityMahaRERA
260 m awayResidential / Group Housing

25 South Tower A 11th to 47th Floor

Twenty Five South Realty Limited · Mumbai City

Aug 2017registered
Dec 2026target completion
1 open complaintScale113 flatsAuthorityMahaRERA
300 m awayResidential / Group Housing

Kalpataru Oceana

Kalpataru Properties (Thane) Pvt. Ltd. · Prabhadevi

Mar 2022registered
Dec 2026target completion
Scale25 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

1515 Moneco

LLOYDS REALTY DEVELOPERS LIMITED · Mumbai City

Oct 2021registered
Sep 2026target completion
Scale29 flatsAuthorityMahaRERA
340 m awayResidential / Group Housing

Lotus Aquaria

SRI LOTUS DEVELOPERS AND REALTY LTD. · Others · Ward GSouth

Mar 2026registered
Dec 2031target completion
Scale122 flatsAuthorityMahaRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.