Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
24 units across 6 batches
TypeArea sq mCount
2.5 BHK571
2.5 BHK591
2.5 BHK605
3 BHK807
4 BHK1014
4 BHK1276
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
MahaRERA · Registration filing
District
Mumbai City
Pincode
400025
Survey no.
F.P NO 1029 OF TPS IV,C S NO. 1576
North boundary
60 FEET WIDE SAYANI ROAD
East boundary
WING A
South boundary
CROWN MILL
West boundary
40 FEET WIDE ROAD
What’s nearby
Schools1 school within 500m · 6 educational institutions within 1km · College or university 659m away
HealthcareHospital 228m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.7km away · Gym or sports centre 261m away · 15+ restaurants and cafes within 1km
Expressway 1.1 km · Dadasaheb Phalke MargPrimary road 290 m · Shankar Ghanekar MargRailway line 644 mMetro station 460m away (Siddhivinayak Temple)15 bus stops within 500m
Water & environment
Water body 637 m
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
Maharashtra registration department
In Maharashtra it’s called the ready reckoner rate.
No government guidance rate is shown for this project.
Mumbai's ready reckoner is addressed by city survey (CTS) number inside a named village, and this filing declares neither — its village field holds a ward or a taluka. Naming one of the zones around it would be a guess, and inside a single division the rates run three-fold.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Complaints & litigation
MahaRERA · public record
Complaints before MahaRERA
MahaRERA's own register
2 complaints · 2 disposed · 0 open
A disposed complaint may have been resolved for or against the builder, and only disputes escalated to MahaRERA appear here at all.
Number
Date
Status
CC12500320
29 Jan 2025
Order Approveddisposed
CC006000000197623
16 Jul 2021
Order Approveddisposed
Orders said not to be complied with
MahaRERA's own register
1 order
Each number is the complaint whose order an application says wasn't complied with; the date is when the application was filed. An application is an allegation, not a finding.
Number
Date
CC006000000197623
10 Feb 2025
What the builder declared
Declared to MahaRERA
Litigation
None declared to MahaRERA
The builder's own declaration at registration — not a court's or MahaRERA's finding. A flagged line is worth checking with MahaRERA.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with MahaRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
06
Other projects nearby
The register · within 25 km
3,018 residential projects still under way within 25 km. Step out ring by ring:
Of the 1,214 projects the radar draws within 6 km — every kind, every stage — 453 are residential projects still under way. This list keeps only those, and looks further out.